LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
A project team for a hospitality project is considering load shifting to off-pea admin 2016-12-22 0941 admin 2016-12-22 11:37
What documentation and information is going to be contained in an operations and admin 2016-12-22 0549 admin 2016-12-22 11:37
Once a project administrator has been selected to lead the group through the LEE admin 2016-12-22 0551 admin 2016-12-22 11:37
A school project has existing electric-powered landscaping and cleaning equipmen admin 2016-12-22 0564 admin 2016-12-22 11:37
A project team is developing a policy to encourage environmentally sensitive sit admin 2016-12-22 0490 admin 2016-12-22 11:37
A building has a restaurant on the first floor and office space on the second an admin 2016-12-22 0489 admin 2016-12-22 11:37
In a mixed-mode system where the mechanical ventilation is inactivated how does admin 2016-12-22 0598 admin 2016-12-22 11:37
A project team planned to conduct a transportation survey over the course a 5-da admin 2016-12-22 0521 admin 2016-12-22 11:37
An urban project with a zero-lot-line has a 4,000 SF (371 m2) vegetated roof. Th admin 2016-12-22 0486 admin 2016-12-22 11:37
What information is NOT needed for each lamp to calculate if all mercury-contain admin 2016-12-22 0492 admin 2016-12-22 11:37
After adjusting a mechanical ventilation system\\\'s minimum damper settings, im admin 2016-12-22 01113 admin 2016-12-22 11:37
In order to receive the maximum points for EA Credit Renewable Energy and Carbon admin 2016-12-22 01068 admin 2016-12-22 11:37
What statement is true about surveying visitors for LT Credit Alternative Transp admin 2016-12-22 0915 admin 2016-12-22 11:37
An existing office building has a 20-year old chiller that uses CFC-11. An owner admin 2016-12-22 01223 admin 2016-12-22 11:37
To earn MR Credit Purchasing-Lamps what percent of mercury-containing lamps purc admin 2016-12-22 0601 admin 2016-12-22 11:37
After initial certification how often does the project team need to conduct a tr admin 2016-12-22 01241 admin 2016-12-22 11:37
Perimeter measurements are more appropriate for a project team to perform for Li admin 2016-12-22 01237 admin 2016-12-22 11:37
What elements are excluded from the calculations for MR Credit Solid Waste Manag admin 2016-12-22 0733 admin 2016-12-22 11:37
At least which percentage of an irrigated landscape area must be submetered for admin 2016-12-22 01196 admin 2016-12-22 11:37
An increased involvement with demand response technologies and programs has whic admin 2016-12-22 0619 admin 2016-12-22 11:37

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-29 16:51 , Processed in 0.066509 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部