LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Which minimum contract length is required for Green Power and Carbon Offsets? admin 2016-10-3 0302 admin 2016-10-3 08:52
Which type of project would most benefit from Enhanced and Monitoring Based Comm admin 2016-10-3 0288 admin 2016-10-3 08:49
Which action would earn a project an IN Credit? admin 2016-10-3 0339 admin 2016-10-3 08:48
The owner an office project wants to use 50% green power, but the direct purchas admin 2016-10-3 0332 admin 2016-10-3 08:46
If a product is extracted, manufactured, and purchased within 100 miles (160 kil admin 2016-10-3 0882 admin 2016-10-3 08:46
A contractor has bins on the site of a construction project for commingled waste admin 2016-10-3 0290 admin 2016-10-3 08:29
When providing glare-control devices for all transparent glazing in regularly oc admin 2016-10-3 0294 admin 2016-10-3 08:25
Selecting furniture that has soft backs and seats for use in an open office plan admin 2016-10-3 0315 admin 2016-10-3 08:24
A retail project is using a tenant-level energy simulation. For display lighting admin 2016-10-3 0340 admin 2016-10-3 08:22
For a product to count toward the achievement of MR Credit Building Disclosure a admin 2016-10-3 0282 admin 2016-10-3 08:15
Which situation might be a result of addressing the surrounding density and dive admin 2016-10-3 0296 admin 2016-10-3 08:13
A project design with mechanical ventilation includes three dedicated outdoor ai admin 2016-10-3 0288 admin 2016-10-3 08:11
A tenant is moving into a new space and is planning for the future growth of the admin 2016-10-3 0310 admin 2016-10-3 08:09
In the case of owner-occupied spaces, at a minimum when must the ownership of th admin 2016-10-3 0344 admin 2016-10-3 08:08
A CxA has finished preparing their Cx report for the building owner, and the pro admin 2016-10-3 0282 admin 2016-10-3 08:05
A project has the following transit service summary:
Light rail:
80 week
admin 2016-10-2 0289 admin 2016-10-2 22:33
The design team in a charrette is discussing an office project that will be loca admin 2016-10-2 0395 admin 2016-10-2 22:33
All of the following are typical systems and equipment in a tenant scope of work admin 2016-10-2 0434 admin 2016-10-2 22:32
A CxA has arrived on a project site to verify the installation and performance o admin 2016-10-2 0292 admin 2016-10-2 22:31
Source reduction includes all EXCEPT which strategy? admin 2016-10-2 0843 admin 2016-10-2 22:30

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 11:53 , Processed in 0.071756 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部