LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Which project would not meet the minimum program requirements for certification? admin 2016-10-1 0374 admin 2016-10-1 20:10
A hospitality project will achieve a 25% water use reduction. The project will a admin 2016-10-1 0406 admin 2016-10-1 20:09
For a building renovation the architect\\\'s plan indicates reuse of interior el admin 2016-10-1 0408 admin 2016-10-1 20:08
For a retail project what does the project team need to identify for the audit a admin 2016-10-1 0403 admin 2016-10-1 20:07
Smoking cannot be prohibited for the full 25 feet (7.5 m) near a building\\\'s f admin 2016-10-1 0378 admin 2016-10-1 20:04
When a \\\'local equivalent\\\' is specified as an alternative to a LEED referen admin 2016-10-1 0412 admin 2016-10-1 19:59
A project team member is reviewing the project design to verify if the appropria admin 2016-10-1 0423 admin 2016-10-1 19:56
The project owner has designated you to hire the Enhanced Commissioning Authorit admin 2016-10-1 0406 admin 2016-10-1 19:43
A developer is considering retail space located in an area with the following us admin 2016-10-1 0413 admin 2016-10-1 19:38
What base building features should be considerations as part of the discovery ph admin 2016-10-1 0403 admin 2016-10-1 18:33
A project team is pursuing EQ Credit Daylight using a daylight simulation and EQ admin 2016-10-1 0403 admin 2016-10-1 18:27
A team in a goal setting-workshop has selected to pursue LEED Gold, identified c admin 2016-10-1 01110 admin 2016-10-1 18:26
A tenant space has an open office plan with several private offices, some storag admin 2016-10-1 0393 admin 2016-10-1 18:22
A project team is reviewing a map showing an office project, two functional entr admin 2016-10-1 0376 admin 2016-10-1 18:15
A project located in a rural area without a recycling program must take which ac admin 2016-10-1 0370 admin 2016-10-1 18:11
Which simulations must be performed if a project team wants to achieve the most admin 2016-9-30 0411 admin 2016-9-30 16:47
Qualified resources for EA Credit Green Power must have come online since which admin 2016-9-30 0370 admin 2016-9-30 16:47
Which options would be considered when evaluating building envelope performance admin 2016-9-30 0413 admin 2016-9-30 16:44
A team member is entering toilet information for calculating the design case for admin 2016-9-30 0396 admin 2016-9-30 16:40
In an existing building retrofit when must all CFC-based equipment in the base b admin 2016-9-30 0403 admin 2016-9-30 16:37

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-12-21 11:25 , Processed in 0.066383 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部