Each item would be developed for EA Prerequisite Fundamental Commissioning and V admin 2016-9-30 0296 admin 2016-9-30 16:35
A 10-story office building will have many tenant spaces. A building owner and en admin 2016-9-30 0288 admin 2016-9-30 16:33
What space is considered regularly occupied in a hotel project that would not be admin 2016-9-30 0305 admin 2016-9-30 16:31
Under which circumstance does a project NOT have to provide preferred parking wh admin 2016-9-30 0323 admin 2016-9-30 16:30
When designing for flexibility, project teams should focus on the portions of th admin 2016-9-30 0325 admin 2016-9-30 16:29
What documentation for MR Prerequisite Storage and Collection of Recyclables is admin 2016-9-30 0294 admin 2016-9-30 16:16
The project team for a small office is calculating the daily baseline indoor wat admin 2016-9-30 0294 admin 2016-9-30 16:15
Which design strategy carries the highest value by LEED in the Material and Reso admin 2016-9-30 0285 admin 2016-9-30 16:06
Project teams are allowed to use aerators to save water under which condition? admin 2016-9-30 0286 admin 2016-9-30 16:05
A LEED AP is collecting information about a site that includes the dwelling unit admin 2016-9-30 0283 admin 2016-9-30 16:04
What value would the cost of salvaged, reused, or reclaimed materials be entered admin 2016-9-30 0287 admin 2016-9-30 16:04
A contractor is planning for an occupied flush-out to reduce IAQ problems from t admin 2016-9-30 0318 admin 2016-9-30 16:01
A project team is reviewing ceiling tiles that would contribute to material ingr admin 2016-9-30 0308 admin 2016-9-30 15:58
What is a trade-off when using a variable refrigerant flow (VRF) system? admin 2016-9-30 0566 admin 2016-9-30 15:55
An office project will include incomplete space when the project team submits th admin 2016-9-30 0286 admin 2016-9-30 15:53
Which system is required to be included in the OPR and BOD if it is part of the admin 2016-9-30 0291 admin 2016-9-30 15:48
A retail store in a mall is heated and cooled by a dedicated outdoor air supply admin 2016-9-30 0284 admin 2016-9-30 15:42
A single-story office building has a multiple-zone ventilation system. The venti admin 2016-9-30 0295 admin 2016-9-30 15:38
In a goal-setting workshop, which information should be documented for IP Credit admin 2016-9-30 0291 admin 2016-9-30 15:37
A building contractor with limited space on the project site has one constructio admin 2016-9-30 0285 admin 2016-9-30 15:35

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 13:20 , Processed in 0.072231 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部