LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
If a building includes a multiple-zone recirculating system and the project team admin 2016-9-30 0301 admin 2016-9-30 09:31
After the owner documents their owner\\\'s project requirements (OPR), the proje admin 2016-9-30 0301 admin 2016-9-30 09:29
After project registration you find a credit the project is attempting is listed admin 2016-9-30 0338 admin 2016-9-30 09:28
A 2,500 SF (233 m2) store pursuing LEED ID+C: Retail is located near a bicycle n admin 2016-9-30 0327 admin 2016-9-30 09:26
For an office project a team is trying to address effective acoustic design. For admin 2016-9-30 0286 admin 2016-9-30 09:24
What design decisions will help a project earn points under the prescriptive pat admin 2016-9-30 0286 admin 2016-9-30 09:12
If a project team is pursuing the prescriptive path of WE Prerequisite Indoor Wa admin 2016-9-30 0296 admin 2016-9-30 09:10
A tenant is leasing 6 stories of an old 10-story building. The base building sys admin 2016-9-30 0319 admin 2016-9-30 09:09
A project team is considering options for diverting the construction waste for a admin 2016-9-30 0289 admin 2016-9-30 09:06
A product will count toward the achievement of MR Credit Building Disclosure and admin 2016-9-30 0287 admin 2016-9-30 09:03
What is the flow rate (gallons per minute) of a 0.2 gallons per cycle (0.76 lpc) admin 2016-9-30 0289 admin 2016-9-30 09:02
A LEED ID+C project will be constructed and operated on a permanent location on admin 2016-9-30 0336 admin 2016-9-30 09:00
A project has a 150-kW PV array that will produce 210,458 kWh of electricity per admin 2016-9-30 0293 admin 2016-9-30 08:57
For EQ Credit Low-Emitting Materials what building products and systems would th admin 2016-9-30 0301 admin 2016-9-30 08:55
What products would both contribute towards MR Credit Building Product Disclosur admin 2016-9-30 0286 admin 2016-9-30 08:54
How is a project going to achieve EQ Credit Low-Emitting Materials without compl admin 2016-9-30 0321 admin 2016-9-30 08:52
Which is an example of content that would be found in a preliminary commissionin admin 2016-9-30 0303 admin 2016-9-30 08:50
Which types of thermal comfort controls contribute to occupant productivity and admin 2016-9-30 0292 admin 2016-9-30 08:48
A non-profit is pursuing LEED ID+C: Commercial Interiors. The facility will have admin 2016-9-30 0291 admin 2016-9-30 08:46
Which non-mandatory steps could a project team take prior to conducting air-qual admin 2016-9-30 0270 admin 2016-9-30 07:57

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 13:20 , Processed in 0.072132 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部