LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
During the construction phase a contractor has painted a wall with high VOC pain admin 2016-9-27 0320 admin 2016-9-27 16:02
When working with a daylighting consultant what inputs will be required for an s admin 2016-9-27 0285 admin 2016-9-27 15:12
Which of the following are phases of the integrative process?(Choose 3) admin 2016-9-27 0354 admin 2016-9-27 14:59
What product would contribute to both MR Credit Building Product Disclosure and admin 2016-9-27 0287 admin 2016-9-27 14:28
At which point in a project\\\'s schedule must the commissioning authority be en admin 2016-9-27 0286 admin 2016-9-27 14:26
When performing the ventilation rate procedure calculations for ASHRAE 62.1-2010 admin 2016-9-27 0311 admin 2016-9-27 14:16
A project building has four stories. Each story is 25,000 SF. The project team w admin 2016-9-27 0314 admin 2016-9-27 14:13
In which LEED credit is sampling allowed? admin 2016-9-27 0319 admin 2016-9-27 14:11
What is the benefit of preparing a concept model for compliance with IP Credit I admin 2016-9-27 0295 admin 2016-9-27 14:04
A project team is reviewing material choices before deciding which products to i admin 2016-9-27 0294 admin 2016-9-27 13:59
How would access to quality transit be documented? admin 2016-9-27 0366 admin 2016-9-27 13:52
A project team in a goal-setting meeting is discussing potential sites and integ admin 2016-9-27 0284 admin 2016-9-27 13:43
In a hospitality project what is the number of default uses per day of a water c admin 2016-9-27 0327 admin 2016-9-27 13:42
What spaces have special considerations specific to a rating system?(Choose 2) admin 2016-9-27 0284 admin 2016-9-27 13:38
The project team for an elementary school is selecting paint to use in the class admin 2016-9-27 0287 admin 2016-9-27 08:00
Which systems, if they are in the project’s scope of work, do NOT have to compl admin 2016-9-27 0966 admin 2016-9-27 07:59
A retail clothing project is located in a mall. All of the following would help admin 2016-9-27 0293 admin 2016-9-27 07:58
When determining the total vehicle parking capacity for a site, which informatio admin 2016-9-27 0288 admin 2016-9-27 07:57
A building owner is reviewing sites that could meet LT Credit Surrounding Densit admin 2016-9-27 0280 admin 2016-9-27 07:56
For the building envelope what documents can be used to confirm the envelope com admin 2016-9-27 0318 admin 2016-9-27 07:55

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 15:31 , Processed in 0.074772 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部