LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
An office project in a cold climate burns natural gas on-site for heating and us admin 2016-9-27 0319 admin 2016-9-27 07:53
The project has 100,000 SF total area of existing interior nonstructural element admin 2016-9-27 0330 admin 2016-9-27 07:51
The architect and other project designers are reviewing material choices for a n admin 2016-9-27 0287 admin 2016-9-27 07:50
A multi-story condominium is within a 1/2-mile (800-meter) walking distance of t admin 2016-9-27 0294 admin 2016-9-27 07:49
For which part of the project design would a project team use tracer gas modelin admin 2016-9-27 0289 admin 2016-9-27 07:46
What is the maximum points a project can earn by selecting a tenant space in a L admin 2016-9-27 0263 admin 2016-9-27 07:44
Which actions does a retail building owner need to take to prevent or minimize o admin 2016-9-27 0291 admin 2016-9-27 07:43
A building has an existing brick enclosure and steel structure. The drywall has admin 2016-9-27 0291 admin 2016-9-27 07:42
Which type(s) of EPD is(/are) always created from a product category rule? admin 2016-9-27 0250 admin 2016-9-27 07:41
For MR Prerequisite Storage and Collection of Recyclables at least two of which admin 2016-9-27 0288 admin 2016-9-27 07:40
A 50,000 SF (4,645 m2) retail project has a baseline parking capacity of 4 parki admin 2016-9-27 0284 admin 2016-9-27 07:36
Early in a design process what does a project team need to ensure that the tenan admin 2016-9-27 0289 admin 2016-9-27 07:34
An office project will have a 5% energy improvement over a baseline building. Th admin 2016-9-27 0292 admin 2016-9-27 07:33
What integrated design solutions allow an offices to be moved within a tenant sp admin 2016-9-27 0301 admin 2016-9-27 07:32
The LEED Pilot Credit for Occupant Engagement is listed only for the O+M rating admin 2016-9-27 0319 admin 2016-9-27 07:30
If a project boundary is not obvious because of ownership by multiple entities, admin 2016-9-27 0288 admin 2016-9-27 07:30
A project team is comparing two potential sites for an office. What must be cons admin 2016-9-27 0268 admin 2016-9-27 07:26
All EXCEPT which documentation can be used to report the material ingredients of admin 2016-9-27 0278 admin 2016-9-27 07:24
Which types of fixtures are NOT eligible for WaterSense labels?(Choose 3) admin 2016-9-26 0290 admin 2016-9-26 22:47
A project team is working on energy and lighting synergies for a hotel project. admin 2016-9-26 0288 admin 2016-9-26 22:44

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 15:31 , Processed in 0.071155 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部