LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A project was registered in January of 2013. In April 2013 USGBC published Adden admin 2016-9-26 0284 admin 2016-9-26 21:53
A CxA is developing an ongoing Cx plan as part of a ten-month review. Which info admin 2016-9-26 0291 admin 2016-9-26 21:51
A project team is designing a tenant space in the top three floors of a 50-story admin 2016-9-26 0830 admin 2016-9-26 21:49
An office project will include 30% incomplete space when the project team submit admin 2016-9-26 0287 admin 2016-9-26 21:42
A project team is installing advanced meters in an office building for interior admin 2016-9-26 0290 admin 2016-9-26 21:40
The performance option for EA Prerequisite Minimum Energy Performance is more ap admin 2016-9-26 0286 admin 2016-9-26 21:37
When conducting a job walk, which details should general contractors, constructi admin 2016-9-26 0286 admin 2016-9-26 21:35
An indoor water use baseline case consists of which information? admin 2016-9-26 0327 admin 2016-9-26 21:32
A project has achieved one pilot credit, has earned exemplary performance in thr admin 2016-9-26 0330 admin 2016-9-26 21:31
What are acceptable ways to identifying the waste disposal needs of a retail pro admin 2016-9-26 0918 admin 2016-9-26 21:06
The owner of a tenant space has had a lot of turnover in the project team, resul admin 2016-9-26 0331 admin 2016-9-26 21:02
A company owner wants to build new headquarters and achieve Platinum certificati admin 2016-9-26 0277 admin 2016-9-26 20:55
For EA Credit Optimize Energy Performance what is the energy performance target admin 2016-9-26 0288 admin 2016-9-26 20:53
What would a project team consult the Federal Trade Commission Guide for Use of admin 2016-9-26 0865 admin 2016-9-26 20:51
What options within LEED credits address different geographic and climactic regi admin 2016-9-26 0285 admin 2016-9-26 20:49
What products would be included in the threshold level of compliance for emissio admin 2016-9-26 0314 admin 2016-9-26 20:47
A retail project is using waste-to-energy as a diversion strategy for MR Credit admin 2016-9-26 0285 admin 2016-9-26 20:45
Which project strategy would earn an exemplary performance point under IN Credit admin 2016-9-26 0258 admin 2016-9-26 20:43
Which qualifying products must always be included in MR credits? admin 2016-9-26 0280 admin 2016-9-26 20:42
Upon which factor are sound isolation requirements dependent? admin 2016-9-26 0287 admin 2016-9-26 20:40

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 17:23 , Processed in 0.072336 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部