LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Which of the following is not a product as it applies to the Building Product Di admin 2016-9-23 0288 admin 2016-9-23 11:06
Which part of the LEED development cycle is used for streamlining the approach t admin 2016-9-23 0260 admin 2016-9-23 11:01
In a retail project using the prescriptive path for WE Prerequisite Indoor Water admin 2016-9-23 0353 admin 2016-9-23 10:59
A project team is using a tenent-level energy simulation for EA Credit Optimize admin 2016-9-23 0285 admin 2016-9-23 10:01
A project team is working on three retail spaces located on different sites in t admin 2016-9-23 0281 admin 2016-9-23 09:58
What can be excluded from the calculations for quality views in an office projec admin 2016-9-23 0288 admin 2016-9-23 09:49
Each naturally ventilated space in a project will need to include a mechanical v admin 2016-9-23 0285 admin 2016-9-23 09:46
When occupancy data is entered into the indoor water use calculator, it is split admin 2016-9-23 0331 admin 2016-9-23 09:36
A CxA has conducted the installation inspections and functional performance test admin 2016-9-23 0288 admin 2016-9-23 09:34
A regularly occupied space near transparent glazing does not receive regular sun admin 2016-9-23 0287 admin 2016-9-23 09:31
Which components are a part of monitoring-based commissioning?(Choose 3) admin 2016-9-23 0348 admin 2016-9-23 09:27
Which product would contribute to Option 2 Optimization of MR Credit Building Pr admin 2016-9-22 0291 admin 2016-9-22 12:21
A project team is purchasing salvaged bricks from a local company that sourced t admin 2016-9-22 0292 admin 2016-9-22 11:18
A project team for a retail project is conducting a waste stream study over a 24 admin 2016-9-22 0881 admin 2016-9-22 11:15
Which first step must all projects take before attempting EA Prerequisite Minimu admin 2016-9-22 0290 admin 2016-9-22 11:13
A retail project includes a retail merchandise area, stockroom, and two private admin 2016-9-22 0292 admin 2016-9-22 11:10
Which special considerations would be part of the LEED project scope?(Choose 2) admin 2016-9-22 0281 admin 2016-9-22 10:55
A project team believes they can generate less than 2.5 pounds of construction w admin 2016-9-22 0856 admin 2016-9-22 10:39
To be successful with MR Prerequisite Storage and Collection of Recyclables, who admin 2016-9-22 0328 admin 2016-9-22 10:38
A project team is working with a general contractor to develop a site-specific p admin 2016-9-19 0385 admin 2016-9-19 13:38

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 20:30 , Processed in 0.074257 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部