LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
A project team member finds an issue not addressed in the LEED reference guide r admin 2016-9-23 0517 admin 2016-9-23 17:27
A project team is adding up the number of separate products used on a project to admin 2016-9-23 0466 admin 2016-9-23 17:21
Which of the following credits for an office project are NOT affected by space c admin 2016-9-23 0487 admin 2016-9-23 17:21
If a project team is pursuing both IP Credit Integrative Process and EA Credit O admin 2016-9-23 0514 admin 2016-9-23 17:20
If the requirements described on a credit form do not match the rating system an admin 2016-9-23 0514 admin 2016-9-23 17:13
Which of the following would be an eligible use near a project? admin 2016-9-23 0584 admin 2016-9-23 17:10
A 10,000 SF tenant space is located in a 150,000 SF high-rise building. The proj admin 2016-9-23 0523 admin 2016-9-23 17:04
Which forms of documentation are acceptable for a project team to submit to docu admin 2016-9-23 0467 admin 2016-9-23 17:02
A project team member was not clear about the specifications for building materi admin 2016-9-23 0480 admin 2016-9-23 16:55
A retail project space has an HVAC system that uses refrigerants with an ODP of admin 2016-9-23 0493 admin 2016-9-23 16:36
A project team is working on the preliminary calculations for furniture reuse fo admin 2016-9-23 0442 admin 2016-9-23 16:10
What minimum amount of gross floor area is required for LEED ID+C projects?
admin 2016-9-23 0487 admin 2016-9-23 16:08
An office project will have space for a combined 100 workstations and private of admin 2016-9-23 0470 admin 2016-9-23 16:06
A project team for a hotel is trying to earn an Innovation credit by including a admin 2016-9-23 01341 admin 2016-9-23 16:01
What should a tenant consider when evaluating spaces that would serve the projec admin 2016-9-23 0518 admin 2016-9-23 16:00
A hospitality project will include a common laundry room, postal area, and heate admin 2016-9-23 0466 admin 2016-9-23 15:47
Which products/materials have additional VOC content requirements for EQ Credit admin 2016-9-23 0490 admin 2016-9-23 15:43
A 50,000 SF (4,645 m2) retail project has a baseline parking capacity of 4 parki admin 2016-9-23 0464 admin 2016-9-23 15:35
How could a project team minimize the amount of contrast building occupants expe admin 2016-9-23 0491 admin 2016-9-23 15:31
At which point during a project schedule is the Basis of Design created? admin 2016-9-23 0472 admin 2016-9-23 15:29

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-30 07:06 , Processed in 0.064832 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部