LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
A project team is working with a general contractor to develop a site-specific p admin 2016-9-19 0579 admin 2016-9-19 13:38
When conducting an inventory of lamps what information would the project team re admin 2016-9-19 01269 admin 2016-9-19 13:38
Which are the primary factors a project team should consider when deciding which admin 2016-9-19 0538 admin 2016-9-19 13:38
A project team is reviewing available site derived non-potable water sources tha admin 2016-9-19 01291 admin 2016-9-19 13:38
What type of activities would be considered renovations as they apply to the fac admin 2016-9-19 01034 admin 2016-9-19 13:38
The WaterSense Water Budget tool uses which variables to determine how much wate admin 2016-9-19 0507 admin 2016-9-19 13:38
A project team is documenting the various site areas of a school for SS Credit S admin 2016-9-19 0469 admin 2016-9-19 13:38
A project has many leased spaces. Under what conditions can the project take an admin 2016-9-19 0523 admin 2016-9-19 13:38
A project team analyzed the survey results for regular occupants to calculate th admin 2016-9-19 0910 admin 2016-9-19 13:38
When developing a transportation survey for regular building occupants and visit admin 2016-9-19 0967 admin 2016-9-19 13:38
Which of the following would be a good candidate for a Pilot Credit? admin 2016-9-19 01195 admin 2016-9-19 13:38
What statement is true regarding the inclusion of lamps in the calculations for admin 2016-9-19 0929 admin 2016-9-19 13:38
A school project has both naturally and mechanically ventilated spaces. To provi admin 2016-9-19 0699 admin 2016-9-19 13:38
A team is pursuing the nonroof option of SS Credit Heat Island Reduction and is admin 2016-9-19 0643 admin 2016-9-19 13:38
A project building with an ENERGY STAR rating of 76 would earn how many points? admin 2016-9-19 01253 admin 2016-9-19 13:38
Under what conditions are the requirements of SS Credit Light Pollution Reductio admin 2016-9-19 0792 admin 2016-9-19 13:38
A project building has a total 100 regular building occupants and visitors. What admin 2016-9-19 01326 admin 2016-9-19 13:38
A school project is located in an area the does not provide composting services. admin 2016-9-19 01135 admin 2016-9-19 13:38
By managing rainwater on site a project team is trying to mimic natural hydrolog admin 2016-9-19 0930 admin 2016-9-19 13:38
The project civil engineer, landscape architect, and hydrologist are meeting to admin 2016-9-19 0472 admin 2016-9-19 13:38

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-30 08:25 , Processed in 0.074176 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部