试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
What are primary responsibilities of the U.S. Green Building Council (USGBC)?(Ch admin 2015-3-3 0434 admin 2015-3-3 13:51
What LEED credits reward projects for improving operational energy performance?( admin 2015-3-3 0442 admin 2015-3-3 13:51
According to the Environmental Protection Agency, how much time do Americans typ admin 2015-3-3 0412 admin 2015-3-3 13:51
Regional priority credits are specific to: admin 2015-3-3 0399 admin 2015-3-3 13:51
Each LEED credit and prerequisite includes the intent of the credit/prerequisite admin 2015-3-3 0431 admin 2015-3-3 13:51
Which of the following spaces will be located closest to a LEED building’s main admin 2015-3-3 0419 admin 2015-3-3 13:51
Performance periods are part of which LEED rating system family? admin 2015-3-3 0442 admin 2015-3-3 13:51
When would a project team need to consider increasing the ventilation levels to admin 2015-3-3 0374 admin 2015-3-3 13:51
In the United States buildings account for ____ carbon dioxide emissions. admin 2015-3-3 0396 admin 2015-3-3 13:51
Which of the following is not a building code? admin 2015-3-3 0429 admin 2015-3-3 13:51
The baseline water use of a toilet is: admin 2015-3-3 0394 admin 2015-3-3 13:51
Who decides if water from showers can be used for irrigation? admin 2015-3-3 0386 admin 2015-3-3 13:51
Selecting products that have been developed with a sustainable design is an exam admin 2015-3-3 0375 admin 2015-3-3 13:51
What does every credit category begin with in the LEED reference guides? admin 2015-3-3 0521 admin 2015-3-3 13:51
What statement is true regarding the LEED Project Checklist? admin 2015-3-3 0375 admin 2015-3-3 13:51
What does the built environment refer to? admin 2015-3-3 0430 admin 2015-3-3 13:51
In the Systems Thinking process, closed systems are synonymous with which of the admin 2015-3-3 0984 admin 2015-3-3 13:51
How is Floor Area Ratio (FAR) defined? admin 2015-3-3 0500 admin 2015-3-3 13:51
A refrigerated warehouse project in the design phase could reduce its electricit admin 2015-3-3 01135 admin 2015-3-3 13:51
Increasing the thermal mass of a building and installing a photovoltaic system w admin 2015-3-3 0435 admin 2015-3-3 13:51

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-12-21 10:43 , Processed in 0.082219 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部