LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
How can exemplary performance be achiev ed for IEQ Credit 2.2 Controllability of google 2013-12-10 0330 google 2013-12-10 10:04
In a mixed-mode ventilated project, meeting what requirement would help achieve google 2013-12-10 0291 google 2013-12-10 10:04
Which of the following are not acceptable ways to monitor CO2 to achieve IEQ Cre google 2013-12-10 0352 google 2013-12-10 10:04
A project is recertifying under a new rating system and one of the credit requir google 2013-12-10 0334 google 2013-12-10 10:04
What two third-party certifications are administered by Food Alliance? google 2013-12-10 0339 google 2013-12-10 10:04
What should be considered to reduce exposure to hazardous chemicals as part of a google 2013-12-10 0309 google 2013-12-10 10:04
A least toxic pesticide is one that meets: google 2013-12-10 0334 google 2013-12-10 10:04
What statement is true for a mechanically ventilated project considering EQ Cred google 2013-12-10 0290 google 2013-12-10 10:04
What is acceptable for demonstrating compliance with WE Credits 3 Water-Efficien google 2013-12-10 0280 google 2013-12-10 10:04
If CFC based refrigerants are present, what annual leakage rate does LEED permit google 2013-12-10 0295 google 2013-12-10 10:04
What strategies help promote hand hygiene as part of a green cleaning policy? google 2013-12-10 0289 google 2013-12-10 10:04
Wood products that are identified as FSC Recycled qualify as what type of conten google 2013-12-10 0295 google 2013-12-10 10:04
For all equipment types, what is the end- of-life refrigerant loss assumed to be google 2013-12-10 0329 google 2013-12-10 10:04
What types of naturally ventilated spaces are exempt from CO2 monitoring require google 2013-12-10 0335 google 2013-12-10 10:04
To qualify for EA Credit 6 Emissions Reduction R eporting projects what must pro google 2013-12-10 0289 google 2013-12-10 10:04
Which statement is true regarding the Innovation in Operations category? google 2013-12-10 0312 google 2013-12-10 10:04
Which of the following is NOT part of a chemical management plan for cooling tow google 2013-12-10 0300 google 2013-12-10 10:04
If the local codes for erosion control are not ve ry stringent, what practices s google 2013-12-10 0288 google 2013-12-10 10:04
What type of energy production is NOT cceptable for achieving EA Credit 4 On-Sit google 2013-12-10 0296 google 2013-12-10 10:04
What changes are NOT updated in the building operating plan after commissioning google 2013-12-10 0333 google 2013-12-10 10:04

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 20:30 , Processed in 0.085764 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部