LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A project is recertifying under a new rating system and one of the credit requir google 2013-9-21 0185 google 2013-9-21 18:27
What credits can earn exemplary performance in the Sustainable Sites category? google 2013-9-21 0200 google 2013-9-21 18:27
What minimum amount of data needs to be stored for trending for a BAS? google 2013-9-21 0186 google 2013-9-21 18:27
What condition should trigger an outdoor air delivery alarm to the system operat google 2013-9-21 0206 google 2013-9-21 18:27
For a gymnasium, what will the project team need to use for the calculations fo google 2013-9-21 0186 google 2013-9-21 18:27
What type of control technology retains sediment after erosion has occurred? google 2013-9-21 0189 google 2013-9-21 18:27
What standard body covers exterior cleaners need to meet in order to contribute google 2013-9-21 0200 google 2013-9-21 18:27
Which of the following would help with the exterior lighting requirements of SS google 2013-9-21 0194 google 2013-9-21 18:27
Which of the following does not allow the team to take a 10% floor exemption in google 2013-9-21 0216 google 2013-9-21 18:27
What organization would be a good resource to research fire prevention methods? google 2013-9-21 0209 google 2013-9-21 18:27
A LEED for Schools building has earned LEED for Existing Buildings: O&M certific google 2013-9-21 0195 google 2013-9-21 18:27
A project with a 30,000 sq. ft. building footpr int has a 100% green roof. After google 2013-9-21 0224 google 2013-9-21 18:27
On which criterion is the value of donated alvaged materials based? google 2013-9-21 0204 google 2013-9-21 18:27
Conducting an ASHRAE Level II Energy Audit would help meet the requirements of w google 2013-9-21 0215 google 2013-9-21 18:27
Which people must respond to a survey in order to achieve IEQ Credit 2.1 Occupan google 2013-9-21 0243 google 2013-9-21 18:27
What issue can occur with ineffective chemical and biological control of cooling google 2013-9-21 0214 google 2013-9-21 18:27
What rate is used as the basis for designing stormwater management facilities an google 2013-9-21 0230 google 2013-9-21 18:27
Chlorofluorocarbons, which are refrigerants that lead to the depletion of the st google 2013-9-21 0198 google 2013-9-21 18:27
The project team is creating policies on how changes should be maintained over google 2013-9-21 0206 google 2013-9-21 18:27
What is a feature of ongoing commissioning? google 2013-9-21 0198 google 2013-9-21 18:27

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-9 00:54 , Processed in 0.084118 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部