LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
How frequently should occupant surveys be performed to achieve IEQ Credit 2.1 Oc google 2013-9-21 0210 google 2013-9-21 18:27
Which of the following is NOT a type of stabilization control for controlling er google 2013-9-21 0213 google 2013-9-21 18:27
The irrigation efficiency (IE) of sprinklers vs. drip irrigation is google 2013-9-21 0219 google 2013-9-21 18:27
Which of the following do NOT need to be taken into consideration to meet the re google 2013-9-21 0234 google 2013-9-21 18:27
What amount of space needs to be audited for achievement of IEQ Credit 3.2 Green google 2013-9-21 0204 google 2013-9-21 18:27
Least toxic chemical pesticides meet what criteria? google 2013-9-21 0201 google 2013-9-21 18:27
Calculations for MR Credit 3 Sustainable Purchasing - Facility Alterations and A google 2013-9-21 0203 google 2013-9-21 18:27
When can a space affected by a flushout be occupied to achieve IEQ Credit 1.5 IA google 2013-9-21 0215 google 2013-9-21 18:27
A project can exclude up to 10% of the building\\\'s gross floor area for the EN google 2013-9-21 0229 google 2013-9-21 18:27
In a space with no partitions, the daylight zone under a skylight is the outline google 2013-9-21 0194 google 2013-9-21 18:27
What materials can be included in the calculations for MR Credit 3 Sustainable P google 2013-9-21 0298 google 2013-9-21 18:27
In what situations is the use of CFC-based refrigerants in HVAC&R base building google 2013-9-21 0209 google 2013-9-21 18:26
At a minimum, which systems must a BAS monitor? google 2013-9-21 0236 google 2013-9-21 18:26
Evapotranspiration-based scheduling uses data analysis to calculate the necessar google 2013-9-21 0200 google 2013-9-21 18:26
In a condominium project, what requirements must be met for ETS control if the h google 2013-9-21 0214 google 2013-9-21 18:26
Which systems need to include a general description in the systems narrative? google 2013-9-21 0228 google 2013-9-21 18:26
Why is a longer performance period beneficial to a project seeking LEED for Exis google 2013-9-21 0182 google 2013-9-21 18:26
Which elements must be documented as part of the LEED for Existing Buildings: O& google 2013-9-21 0185 google 2013-9-21 18:26
What occupant comfort conditions are specified by ASHRAE 55-2004? google 2013-9-21 0197 google 2013-9-21 18:26
What standards for cleaning products test for toxicity to aquatic life and biode google 2013-9-21 0204 google 2013-9-21 18:26

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 19:42 , Processed in 0.077884 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部