LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
For LEED-ND, bicycle parking and storage requirements are based on what factors? google 2013-8-28 0213 google 2013-8-28 11:15
For SLL Credit Site Design for Habitat or Wetland and Water Body Conservation, b google 2013-8-28 0194 google 2013-8-28 11:14
A project team has determined the mass of infrastructure materials as:

google 2013-8-28 0227 google 2013-8-28 11:12
What minimum number of buildings must be connected to a DHC system for GIB Credi google 2013-8-28 0225 google 2013-8-28 11:10
On what type of sites must the state fish and wildlife agency and the state natu google 2013-8-28 0208 google 2013-8-28 11:09
What type of site condition indicates the team should conduct a biological surve google 2013-8-28 0236 google 2013-8-28 11:06
A residential project will include the addition of new streets. What should the google 2013-8-28 0200 google 2013-8-28 11:01
A site has a water body on it. What is not considered a minor improvement within google 2013-8-28 0204 google 2013-8-28 10:52
Cul-de-sacs generally reduce street network density. They may be appropriate whe google 2013-8-28 0198 google 2013-8-28 10:29
Which of the following strategies if implemented will not help meet the credit r google 2013-8-28 0220 google 2013-8-28 10:26
Which of the following is not a universal design that can help a project earn NP google 2013-8-28 0194 google 2013-8-28 10:17
What would qualify as a cultural landscape for LEED? google 2013-8-28 0199 google 2013-8-28 09:56
A project has 9 habitable buildings. Five of the buildings are existing and four google 2013-8-28 0198 google 2013-8-28 09:46
A 1,000 acre project will include a residential component. Where must existing f google 2013-8-28 0225 google 2013-8-28 09:42
A project’s total building square footage is 500,000 SF. What amount of square google 2013-8-28 0224 google 2013-8-28 09:40
What size lot is considered entirely previously developed? google 2013-8-28 0224 google 2013-8-28 09:40
What minimum amount of wastewater must a project retain on-site and use to repla google 2013-8-28 0223 google 2013-8-28 09:38

Which of the following would be counted as a valid intersection for interse
google 2013-8-28 0198 google 2013-8-28 09:34
A nonresidential redevelopment project has public rights-of way within the proje google 2013-8-28 0232 google 2013-8-28 09:28
After consulting with a transit agency, the developer installs approved shelters google 2013-8-28 0203 google 2013-8-28 09:21

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 22:37 , Processed in 0.076250 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部