LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A 5 acre project in a city has two office buildings with retail and no residenti google 2013-8-2 0221 google 2013-8-2 13:18
For what minimum amount of time must a conservation management plan be carried o google 2013-8-2 0196 google 2013-8-2 13:18
On what type of sites must the state fish and wildlife agency and the state natu google 2013-8-2 0220 google 2013-8-2 13:17
Durable goods have a useful life of ____ or more. google 2013-8-2 0195 google 2013-8-2 11:10
What minimum area of landscape needs to be submetered for WE Credit 1 Water google 2013-7-29 0202 google 2013-7-29 20:05
A residential project will include new streets. What can be substituted for side google 2013-7-24 0200 google 2013-7-24 14:56
A transit agency determines that transit stops will be warranted within two year google 2013-7-24 0185 google 2013-7-24 14:56
When submitting maps for documentation, what should be included on the map?
google 2013-7-24 0199 google 2013-7-24 14:56
For single dwelling unit buildings what does each unit need for Visitability? google 2013-7-24 0208 google 2013-7-24 14:56
What three types of maps should project teams use for documentation?
(Choose
google 2013-7-24 0210 google 2013-7-24 14:56
What should be addressed in the design for an optimal building orientation?
google 2013-7-24 0201 google 2013-7-24 14:56
What must be excluded from the calculations for building reuse?
(Choose 2)
google 2013-7-24 0208 google 2013-7-24 14:56
A residential project will include 200 new dwelling units on 10 acres. What must google 2013-7-24 0220 google 2013-7-24 14:56
Which of the following does not have to occur to qualify for GIB Credit Solar Or google 2013-7-24 0196 google 2013-7-24 14:56
Which of the following are structural controls for construction activity polluti google 2013-7-24 0189 google 2013-7-24 14:56
A nonresidential building project will have new off-street surface parking lots google 2013-7-24 0199 google 2013-7-24 14:56
Which of the following design strategies would not qualify for SLL Credit Restor google 2013-7-24 0199 google 2013-7-24 14:56
What must be included in a management plan for SLL Credit Long-Term Conservation google 2013-7-24 0199 google 2013-7-24 14:56
Which of the following would qualify as a neighborhood center on a project of 40 google 2013-7-24 0181 google 2013-7-24 14:56
A project member is determining the nonresidential land-use density. What will t google 2013-7-24 0199 google 2013-7-24 14:56

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 12:55 , Processed in 0.079534 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部