LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
A project would like to reduce the heat island for 50% of nonroof site hardscape google 2013-8-6 0521 google 2013-8-6 05:49
An undeveloped site has a slope over 15%. What does not have to occur to protect google 2013-8-6 0566 google 2013-8-6 05:49
A project has ten new buildings. Eight of the buildings have low sloped roofs an google 2013-8-6 0522 google 2013-8-6 05:49
What minimum frequency must agriculture shares be delivered to dwelling units fo google 2013-8-6 0489 google 2013-8-6 05:49
What does not qualify as significant habitat for SLL Credit Site Design for Habi google 2013-8-6 0496 google 2013-8-6 05:49
Which of the following is not a designated high priority location as defined for google 2013-8-6 0468 google 2013-8-6 05:49
What must be true of a building\\\'s design for the building to benefit GIB Cred google 2013-8-6 0486 google 2013-8-6 05:49
What is excluded as a type of water body or wetland for SLL Prerequisite Wetland google 2013-8-6 0478 google 2013-8-6 05:49
How does LEED-ND define covenants, conditions, and restrictions (CC&Rs)?
google 2013-8-6 0495 google 2013-8-6 05:49
A redevelopment project will add 100 new project dwelling units to an existing 6 google 2013-8-6 0455 google 2013-8-6 05:49
What average percentage improvement over ASHRAE 90.1-2007 would the major renova google 2013-8-6 0507 google 2013-8-6 05:49
A project will have four mixed-use buildings and with dwelling units above the f google 2013-8-6 0500 google 2013-8-6 05:49
project site is located next to a right-of-way. What must the project team cons google 2013-8-6 0491 google 2013-8-6 05:49
A project earned 4 points under NPD Credit 2 Compact Development. What minimum a google 2013-8-6 0477 google 2013-8-6 05:49
A developer sponsored transit service must include what features for NPD Credit google 2013-8-6 0501 google 2013-8-6 05:49
A project will have eight habitable buildings. Five of the buildings will be new google 2013-8-6 0489 google 2013-8-6 05:49
How can a project achieve 2 points for brownfield redevelopment? google 2013-8-6 0481 google 2013-8-6 05:49
Best management practices (BMPs) to control erosion and sedimentation must be se google 2013-8-6 0483 google 2013-8-6 05:49
Which of the following would need to be done to earn SSL Prerequisite Smart Loca google 2013-8-6 0504 google 2013-8-6 05:49
A project includes retail and mixed-use blocks. What design for new sidewalks wo google 2013-8-6 0498 google 2013-8-6 05:49

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-19 13:55 , Processed in 0.120166 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部