LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Which of the following if present on a site would need to be protected for SLL P google 2013-7-24 0204 google 2013-7-24 14:56
A project will have four mixed-use buildings that will have a total of 20 retail google 2013-7-24 0204 google 2013-7-24 14:56
What minimum building water efficiency is needed for LEED-ND projects? google 2013-7-24 0199 google 2013-7-24 14:56
Shelters do not have to include what feature for NPD Credit Transit Facilities? google 2013-7-24 0203 google 2013-7-24 14:56
Which credits cannot earn a project any additional points for GIB Credit Stormwa google 2013-7-24 0201 google 2013-7-24 14:56
A project site is not served by existing water and wastewater infrastructure. Wh google 2013-7-24 0226 google 2013-7-24 14:56
An infill project with nonresidential buildings will generate 300 new full-time- google 2013-7-24 0199 google 2013-7-24 14:56
A project team has determined the mass of infrastructure materials as:

google 2013-7-24 0201 google 2013-7-24 14:56
A project includes a residential component that is within walking distance to ex google 2013-7-24 0198 google 2013-7-24 14:56
A project with affected soils cannot qualify for Option 2 Infill Sites, Option 3 google 2013-7-24 0198 google 2013-7-24 14:56
What type of renewable energy sources are acceptable towards earning GIB Credit google 2013-7-24 0222 google 2013-7-24 14:56
What locations would earn a project points for SLL Credit Preferred Locations? google 2013-7-24 0203 google 2013-7-24 14:56
A project will include construction on a portion of undeveloped land. What must google 2013-7-24 0196 google 2013-7-24 14:56
Which of the following is a stabilization control for construction activity poll google 2013-7-24 0197 google 2013-7-24 14:56
A project will include all new infrastructure. What amount of annual energy savi google 2013-7-24 0204 google 2013-7-24 14:56
A site has a water body on it. What could be done to the site and still have the google 2013-7-24 0201 google 2013-7-24 14:56
LEED-ND may not be appropriate for what situations?
google 2013-7-24 0217 google 2013-7-24 14:56
What is earth with chemical, hydrographic, and topological properties that make google 2013-7-24 0219 google 2013-7-24 14:56
A portion of a project site is covered by a 100-year moderate-risk floodplain. A google 2013-7-24 0197 google 2013-7-24 14:56
A project is located on a previously developed site. The project achieved 2 poin google 2013-7-24 0214 google 2013-7-24 14:56

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 12:57 , Processed in 0.079444 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部