LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
For NPD Credit Street Network a street or nonmotorized right-of-way must pass th google 2013-7-24 0204 google 2013-7-24 14:56
What locations would earn a project points for SLL Credit Preferred Locations? < google 2013-7-24 0199 google 2013-7-24 14:56
What can be used for clear glass for Ground Level Use and Parking for NPD Credit google 2013-7-24 0198 google 2013-7-24 14:56
A project is located on a brownfield site. The project has in place best managem google 2013-7-24 0215 google 2013-7-24 14:56
Which building would not meet the requirements for GIB Certified Green Building? google 2013-7-24 0207 google 2013-7-24 14:56
A mixed-use project has blocks that are 1,000 feet long. The project will have 1 google 2013-7-24 0193 google 2013-7-24 14:56
What type of project is District Heating and Cooling (DHC) technology best suite google 2013-7-24 0192 google 2013-7-24 14:56
Which design decision will require a construction waste management plan for GIB google 2013-7-24 0216 google 2013-7-24 14:56
In addition to locating a project in a high-priority redevelopment area, what ot google 2013-7-24 0220 google 2013-7-24 14:56
A 100 acre project is multiunit residential and retail. What will be needed to e google 2013-7-24 0188 google 2013-7-24 14:56
A project is 25 acres and will include 150,000 square feet of retail space, incl google 2013-7-24 0193 google 2013-7-24 14:56
A project will achieve NPD Prerequisite Walkable Streets. What increase in build google 2013-7-24 0198 google 2013-7-24 14:56
What is not part of a management plan for SLL Credit Long-Term Conservation Mana google 2013-7-24 0215 google 2013-7-24 14:56
A project specific evapotranspiration rate is determined by multiplying what two google 2013-7-24 0193 google 2013-7-24 14:56
Which of the following will not help with Community Outreach to qualify for NPD google 2013-7-24 0210 google 2013-7-24 14:56
A single big box store contains a grocery store, retail, pharmacy, and optometri google 2013-7-24 0214 google 2013-7-24 14:56
What annual energy reduction is needed for GIB Credit Infrastructure Energy Effi google 2013-7-24 0197 google 2013-7-24 14:56
A project is located in a jurisdiction that provides recycling services and haza google 2013-7-24 0216 google 2013-7-24 14:56
A project will have two existing mixed-use buildings that will be renovated. The google 2013-7-24 0198 google 2013-7-24 14:56
A planned multiunit residential project will have 100 planned occupants living i google 2013-7-24 0198 google 2013-7-24 14:56

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 05:15 , Processed in 0.076997 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部