LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表

An Owner of a new office building would like to install a photovoltaic s
admin 2012-12-15 0608 admin 2012-12-15 22:28
A project team is using the performance rating method for Energy and Atmosphere admin 2012-12-7 0744 admin 2012-12-7 15:30
Which of the following can affect calculations for Water Efficient Landscaping? admin 2012-11-23 0609 admin 2012-11-23 15:32
A project team is attempting to earn points for Energy and Atmosphere credit, Op admin 2012-11-23 0683 admin 2012-11-23 15:32
A tenant space has the following areas and lighting power densities: 720 sf. of admin 2012-11-15 0598 admin 2012-11-15 11:14
Show Answer Legend A project team is meeting with the facility operator to PrincessWas 2012-11-15 01307 PrincessWas 2012-11-15 11:14
A project space contains mixed mode ventilation where tenants share a central HV PrincessWas 2012-11-15 0453 PrincessWas 2012-11-15 11:14
A project has a $10 million materials budget. What estimated value of materials PrincessWas 2012-11-15 0537 PrincessWas 2012-11-15 11:14
Which of the following can increase the heat island effect in urban areas? (choo admin 2012-11-15 0664 admin 2012-11-15 06:52
What would having a project with pedestrian access between the project building admin 2012-11-15 0502 admin 2012-11-15 06:51
Bonus points under the LEED rating systems are awarded when what occurs?(choose admin 2012-11-15 0609 admin 2012-11-15 06:51
What is the primary difference between LEED for Existing Buildings: Operations & admin 2012-11-14 0545 admin 2012-11-14 08:14
The type of refrigerant selected for a building will impact what LEED credit cat admin 2012-11-11 0719 admin 2012-11-11 18:53
What does a building need to have for community connectivity?

PrincessWas 2012-11-11 0538 PrincessWas 2012-11-11 18:51
What organization develops building safety and fire prevention codes to construc admin 2012-11-11 01027 admin 2012-11-11 18:51
A building has an 11,000 square foot, low sloped (slope is <2:12) roof. 1000 sq admin 2012-11-10 0502 admin 2012-11-10 17:59
If a building will have a glazed facade, what should be done for the project des admin 2012-11-10 0649 admin 2012-11-10 17:59
A small warehouse has a materials cost of $200,000. What is the minimum amount o admin 2012-11-10 0555 admin 2012-11-10 17:59
Which of the following scenarios would NOT contribute to satisfying the prerequi admin 2012-11-10 0567 admin 2012-11-10 17:59
What are some potential strategies for achieving the Enhanced Refrigerant Manage admin 2012-11-10 0505 admin 2012-11-10 17:59

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-19 11:35 , Processed in 0.067253 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部