LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
How can the additional energy needed for increasing the ventilation in a buildin admin 2012-10-23 0461 admin 2012-10-23 14:24
A new college campus building will have 20 full time staff (8 hr/day) and 4 part admin 2012-10-23 0435 admin 2012-10-23 14:24
An existing building is undergoing a major renovation. The annual baseline energ admin 2012-10-23 0438 admin 2012-10-23 14:24
When calculating the Landscape Coefficient, what variable accounts for the numbe admin 2012-10-23 0472 admin 2012-10-23 14:24
Which of the following is NOT an option for achieving Sustainable Sites credit, admin 2012-10-23 0414 admin 2012-10-23 14:24
Which standard will be used to demonstrate a 10% improvement in the proposed bui admin 2012-10-23 0519 admin 2012-10-23 14:24
A school project has a site development density of 130,000 SF/acre in an area th admin 2012-10-23 0520 admin 2012-10-23 14:24
Which of the following are requirements of Indoor Environmental Quality credit, admin 2012-10-23 0383 admin 2012-10-23 14:24
A manufacturing plant will install solar car ports in the parking lot to generat google 2012-10-23 0440 google 2012-10-23 14:24
Which two of the following are options for achieving Sustainable Sites credit, A admin 2012-10-23 0411 admin 2012-10-23 14:24
A project team is using cotton insulation that is grown and manufactured 400 mil admin 2012-10-23 0408 admin 2012-10-23 14:24
A new office building has a baseline annual energy usage of $280,000. The proj admin 2012-10-23 0436 admin 2012-10-23 14:24
A school project team doing a renovation of a historic school is using the perfo admin 2012-10-23 0500 admin 2012-10-23 14:24
As it pertains to all LEED credits, when should a building’s occupancy be measu admin 2012-10-23 0484 admin 2012-10-23 14:24
A baseline analysis was performed and a building was found to potentially use 1, admin 2012-10-23 0452 admin 2012-10-23 14:24
A project will use FSC Pure wood for all wood on the project. Who is not require google 2012-10-23 0420 google 2012-10-23 14:24
Which of the following scenarios would NOT directly contribute to a project earn admin 2012-10-23 0463 admin 2012-10-23 14:24
The use of onsite treated wastewater can help with what credit areas? admin 2012-10-23 0400 admin 2012-10-23 14:24
A school project plans to reuse 265 sf of cabinets, 10,500 sf of interior nonstr admin 2012-10-23 0497 admin 2012-10-23 14:24
A project building has the following spaces:
Space Floor Area (sf) Horizonta
google 2012-10-23 0462 google 2012-10-23 14:24

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-12-15 06:02 , Processed in 0.079895 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部