LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
When performing a whole building simulation for Energy and Atmosphere Credit, Op admin 2012-9-29 0225 admin 2012-9-29 17:12
The total cost of a project is $10,000,000 (CSI divisions 2-10 only). For LEED c admin 2012-9-29 0212 admin 2012-9-29 17:12
A school project is near rural farmland. The project site was previously a retai admin 2012-9-29 0310 admin 2012-9-29 17:12
A building on a college campus has 80 full-time staff and 40 part-time staff (4 google 2012-9-29 0222 google 2012-9-29 17:12
To comply with the OPTION 2 compliance path for Sustainable Sites credit, Heat I admin 2012-9-29 0202 admin 2012-9-29 17:12
A project team is deciding on what measures to include to control soil erosion. admin 2012-9-29 0246 admin 2012-9-29 17:12
Which of the following LEED credits specifically prohibits the use of added urea admin 2012-9-29 0240 admin 2012-9-29 17:12
A project team is attempting to satisfy the requirements of Sustainable Sites cr admin 2012-9-29 0192 admin 2012-9-29 17:12
BMPs used to treat runoff must be capable of removing: google 2012-9-29 0215 google 2012-9-29 17:12
A new building is estimated to have an annual energy cost of $100,000. What is t admin 2012-9-29 0230 admin 2012-9-29 17:12
When calculating a building’s baseline energy consumption, process loads can be admin 2012-9-29 0196 admin 2012-9-29 17:12
What variable accounts for the water needs by different plant species? admin 2012-9-29 0217 admin 2012-9-29 17:12
An early design of a building includes a fire suppression system containing Halo admin 2012-9-29 0288 admin 2012-9-29 17:12
Whick of the following are NOT compliance OPTIONS for Indoor Environmental Quali admin 2012-9-29 0325 admin 2012-9-29 13:32
hich of the following can affect calculations for Water Efficient Landscaping? ( admin 2012-9-29 0213 admin 2012-9-29 13:32
A project team is looking to earn as many LEED points as possible by taking adva admin 2012-9-29 0264 admin 2012-9-29 13:32
A design team wants to earn as many points as possible under Energy and Atmosph admin 2012-9-29 0282 admin 2012-9-29 13:32
For a 15-story condominium project, what considerations MUST the design team mak admin 2012-9-29 0230 admin 2012-9-29 13:32
How close does a building’s entrance need to be to a rail station or bus stop t google 2012-9-29 0199 google 2012-9-29 13:32
The design team for a 15-story office building is looking for ways to increase d admin 2012-9-29 0302 admin 2012-9-29 13:32

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-6 02:53 , Processed in 0.078835 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部