LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
All of the following systems are ineligible for Energy and Atmosphere Credit, On admin 2012-9-29 0334 admin 2012-9-29 13:32
A project site has been selected for a new retail building on a previously devel admin 2012-9-29 0457 admin 2012-9-29 13:32
Some of the design strategies a project team is proposing include daylighting, d admin 2012-9-29 0369 admin 2012-9-29 13:32
Which member of the project team would most likely ensure that a project meets t admin 2012-9-29 0399 admin 2012-9-29 13:32
A flooring product consists of a top layer of salvaged pine hardwoods glued to a google 2012-9-29 0349 google 2012-9-29 13:32
A small office building is determined to have 10 FTE female and 10 FTE male occu admin 2012-9-29 0288 admin 2012-9-29 13:32
A new 10 story office building will be built in an arid region. Installing occup admin 2012-9-29 0465 admin 2012-9-29 13:32
For a LEED for New Construction residential building, what percentage of buildin admin 2012-9-29 0292 admin 2012-9-29 13:32
A company owner is helping to plan a new high-performance building for the busin admin 2012-9-29 0369 admin 2012-9-29 13:32
Through a whole building simulation, a school renovation project has demonstrate admin 2012-9-29 0372 admin 2012-9-29 13:32
If the answer choices had specified kWh / yr then 463,222 kWh/yr X 35% would be admin 2012-9-29 0355 admin 2012-9-29 13:32
Which of the following salvaged materials would NOT contribute to achieving Mat admin 2012-9-29 0370 admin 2012-9-29 13:32
A project team had a utility company install a photovoltaic system where the uti google 2012-9-29 0378 google 2012-9-29 13:32
A new factory is estimated to have $80,000 of wood-based materials and products admin 2012-9-29 0310 admin 2012-9-29 13:32
What is the stormwater runoff equivalent for managing 90% of the average annual admin 2012-9-29 0447 admin 2012-9-29 13:32
Installing metering equipment to measure energy use is done as part of which cre admin 2012-9-29 0291 admin 2012-9-29 13:32
A building owner is reviewing sites that could meet Sustainable Sites Credit, De google 2012-9-29 0398 google 2012-9-29 13:32
A mixed-use project site will have three restaurants, a post-office, and a conve admin 2012-9-29 0374 admin 2012-9-29 13:32
What is the minimum percentage of occupied spaces that must meet minimum dayligh admin 2012-9-29 0347 admin 2012-9-29 13:32
How much does a project’s landscape irrigation need to be reduced, from a calcu admin 2012-9-29 0356 admin 2012-9-29 13:32

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 00:35 , Processed in 0.082609 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部