All of the following systems are ineligible for Energy and Atmosphere Credit, On admin 2012-9-29 0237 admin 2012-9-29 13:32
A project site has been selected for a new retail building on a previously devel admin 2012-9-29 0375 admin 2012-9-29 13:32
Some of the design strategies a project team is proposing include daylighting, d admin 2012-9-29 0290 admin 2012-9-29 13:32
Which member of the project team would most likely ensure that a project meets t admin 2012-9-29 0316 admin 2012-9-29 13:32
A flooring product consists of a top layer of salvaged pine hardwoods glued to a google 2012-9-29 0262 google 2012-9-29 13:32
A small office building is determined to have 10 FTE female and 10 FTE male occu admin 2012-9-29 0213 admin 2012-9-29 13:32
A new 10 story office building will be built in an arid region. Installing occup admin 2012-9-29 0371 admin 2012-9-29 13:32
For a LEED for New Construction residential building, what percentage of buildin admin 2012-9-29 0203 admin 2012-9-29 13:32
A company owner is helping to plan a new high-performance building for the busin admin 2012-9-29 0228 admin 2012-9-29 13:32
Through a whole building simulation, a school renovation project has demonstrate admin 2012-9-29 0284 admin 2012-9-29 13:32
If the answer choices had specified kWh / yr then 463,222 kWh/yr X 35% would be admin 2012-9-29 0252 admin 2012-9-29 13:32
Which of the following salvaged materials would NOT contribute to achieving Mat admin 2012-9-29 0224 admin 2012-9-29 13:32
A project team had a utility company install a photovoltaic system where the uti google 2012-9-29 0303 google 2012-9-29 13:32
A new factory is estimated to have $80,000 of wood-based materials and products admin 2012-9-29 0232 admin 2012-9-29 13:32
What is the stormwater runoff equivalent for managing 90% of the average annual admin 2012-9-29 0371 admin 2012-9-29 13:32
Installing metering equipment to measure energy use is done as part of which cre admin 2012-9-29 0205 admin 2012-9-29 13:32
A building owner is reviewing sites that could meet Sustainable Sites Credit, De google 2012-9-29 0320 google 2012-9-29 13:32
A mixed-use project site will have three restaurants, a post-office, and a conve admin 2012-9-29 0295 admin 2012-9-29 13:32
What is the minimum percentage of occupied spaces that must meet minimum dayligh admin 2012-9-29 0267 admin 2012-9-29 13:32
How much does a project’s landscape irrigation need to be reduced, from a calcu admin 2012-9-29 0265 admin 2012-9-29 13:32

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-6 09:52 , Processed in 0.081958 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部