LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
What is DRIP IRRIGATION?

Drip irrigation delivers water at low pressure
admin 2012-9-21 0500 admin 2012-9-21 11:16
What is XERISCAPING?

Xeriscaping is a landscaping method that makes rou
admin 2012-9-21 0510 admin 2012-9-21 11:16
What is BLACKWATER?

Blackwater is wastewater from toilets and urinals.
admin 2012-9-21 0528 admin 2012-9-21 11:16
What codes define GRAYWATER?

Uniform Plumbing Code (UPC)
Plumbing C
admin 2012-9-21 0826 admin 2012-9-21 11:16
HARVESTED STORMWATER can be substituted
for what types of potable water use?
admin 2012-9-21 0732 admin 2012-9-21 11:16
What does PREFERRED PARKING refer to?

Preferred parking refers to the p
admin 2012-9-21 0618 admin 2012-9-21 11:16
What defines LOW-EMITTING and FUELEFFICIENT
vehicles?

They are clas
admin 2012-9-21 0568 admin 2012-9-21 11:16
How many LEED AP\\\'s are required to participate
in a project to earn one I
admin 2012-9-21 0608 admin 2012-9-21 11:16
What is PRE-CONSUMER recycled content?

Pre-consumer recycled content is
admin 2012-9-21 0594 admin 2012-9-21 11:16
What is POSTCONSUMER RECYCLED content?

It is the percentage of material
admin 2012-9-21 0683 admin 2012-9-21 11:16
What is a FULL-TIME EQUIVALENT (FTE)?

Is a regular building occupant wh
admin 2012-9-21 0796 admin 2012-9-21 11:16
How many CERTIFICATION LEVELS are available
to a LEED project?

4 -
admin 2012-9-21 0499 admin 2012-9-21 11:16
What does a PREREQUISITE represent?

A prerequisite represents the key c
admin 2012-9-21 0573 admin 2012-9-21 11:16
How does GERRYMANDERING relate to a LEED
project boundary?

Gerryman
admin 2012-9-21 0496 admin 2012-9-21 11:16
What is the LEED PROJECT BOUNDARY?

It is the portion of the project sit
admin 2012-9-21 0794 admin 2012-9-21 11:16
What is the purpose of a LEED SCORECARD?

The LEED Scorecard is to assis
admin 2012-9-21 0817 admin 2012-9-21 11:16
What is LEED ONLINE?

LEED online is the primary resource for managing t
admin 2012-9-21 0500 admin 2012-9-21 11:16
For multiple building developments who
determines the LEED PROJECT BOUNDARY?
admin 2012-9-21 0567 admin 2012-9-21 11:16
What is the minimum BUILDING AREA TO SITE
RATIO?

The gross floor ar
admin 2012-9-21 0532 admin 2012-9-21 11:16
What is the minimum FULL TIME EQUIVALENT
(FTE) occupancy for a LEED project?
admin 2012-9-21 0783 admin 2012-9-21 11:16

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-19 00:31 , Processed in 0.093636 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部