LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A small office building was found to have a surface area of 200,000 square feet admin 2012-8-30 0258 admin 2012-8-30 14:05
Which member of the project team would most likely be responsible for enforcing admin 2012-8-30 0340 admin 2012-8-30 14:05
Which of the following can contribute to credit compliance for Sustainable Sites admin 2012-8-30 0305 admin 2012-8-30 14:05
Using the CBECS database, a project team has estimated a new office building to admin 2012-8-29 0257 admin 2012-8-29 09:31
An existing LEED for New Construction project will be renovated for a new tenant admin 2012-8-29 0243 admin 2012-8-29 09:31
To meet the requirements of Indoor Environmental Quality credit, Low-Emitting Ma admin 2012-8-29 0370 admin 2012-8-29 09:31
When verifying negative pressure in designated smoking rooms, tests are conducte admin 2012-8-29 0426 admin 2012-8-29 09:31
Which of the following are NOT subject to the requirements of Energy and Atmosph admin 2012-8-29 0505 admin 2012-8-29 09:31
A project moved beyond the design phase before a green-building consultant was a admin 2012-8-28 0231 admin 2012-8-28 19:45
A mixed-use project includes office space and residential units. What energy usi admin 2012-8-28 0296 admin 2012-8-28 19:45
A project is being built on a 6 acre Greenfield site. A civil engineer has deter admin 2012-8-28 0245 admin 2012-8-28 19:45
The project owner has designated you to hire the Enhanced Commissioning Authorit admin 2012-8-28 0304 admin 2012-8-28 19:45
An owner has changed the landscaping design for a project from non-native plants admin 2012-8-28 0262 admin 2012-8-28 19:45
A project team is designing a stormwater management system to earn Sustainable S admin 2012-8-28 0330 admin 2012-8-28 19:45
What are structural strategies to reduce water pollution from stormwater for LEE admin 2012-8-28 0222 admin 2012-8-28 19:45
Which systems will contribute to earning Energy and Atmosphere Credit, On-Site R admin 2012-8-28 0197 admin 2012-8-28 19:45
LEED Technical Advisory Groups (TAGs) rule on what topics?(choose 2) admin 2012-8-28 0337 admin 2012-8-28 19:45
A new construction project is purchasing salvaged bricks from a local company th google 2012-8-28 0329 google 2012-8-28 19:45
A new construction project is going to conduct a phased flush out of the buildin google 2012-8-28 0289 google 2012-8-28 19:45
A school project will require 20 buses and 10 maintenance vehicles. The project google 2012-8-28 0418 google 2012-8-28 19:45

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-3 22:22 , Processed in 0.086936 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部