LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
What is a useful strategy for water efficient landscaping? admin 2012-8-28 0341 admin 2012-8-28 19:44
A proposed 80,000 sq. ft. building with 4 equal floors is being built for office google 2012-8-28 0357 google 2012-8-28 19:44
A Core and Shell project in an urban area has a stacked building plan, minimal p admin 2012-8-28 0514 admin 2012-8-28 19:44
A new high-rise residential project is going up in a master site development. Th admin 2012-8-28 0490 admin 2012-8-28 19:44
The project team is discussing commissioning activities in a pre-design meeting admin 2012-8-28 0358 admin 2012-8-28 19:44
The new addition to a school will not be completed before the new school year be google 2012-8-28 0402 google 2012-8-28 19:44
Which factor is used to determine the percentage of materials reused on a projec google 2012-8-28 0308 google 2012-8-28 19:44
A college building used for engineering classes has a baseline water use of 400, admin 2012-8-28 0404 admin 2012-8-28 19:44
What document describes best practices for measuring and verifying the energy pe admin 2012-8-28 0389 admin 2012-8-28 19:44
A project team for a new high school is developing curriculum around the
hig
google 2012-8-28 0377 google 2012-8-28 19:44
Question 41
A design team is working on water use reduction strategies for a
google 2012-8-28 0349 google 2012-8-28 19:44
A school project worked with both the school board and the community to share fa admin 2012-8-28 0404 admin 2012-8-28 19:44
A new mixed-use construction project will include an onsite wastewater treatment admin 2012-8-28 0415 admin 2012-8-28 19:44
How can the additional energy needed for increasing the ventilation in a buildin google 2012-8-28 0342 google 2012-8-28 19:44
A new library will have a 10% energy improvement over a baseline building. The p admin 2012-8-28 0376 admin 2012-8-28 19:44
The project team for a small office is calculating the daily baseline indoor wat admin 2012-8-28 0438 admin 2012-8-28 19:44
A project team is planning to use green power obtained from a separate campus fa admin 2012-8-28 0503 admin 2012-8-28 19:44
Within the Water Efficiency category, which of the following sets of credits can admin 2012-8-28 0353 admin 2012-8-28 19:44
An abandoned building in a downtown area has been chosen for the site of a new m admin 2012-8-28 0403 admin 2012-8-28 19:44
An urban new construction project with a zero lot line will have a roof vegetate admin 2012-8-28 0537 admin 2012-8-28 19:44

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-10 15:03 , Processed in 0.081376 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部