LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
A new construction project must at a minimum use ___ less water than the buildin admin 2012-8-28 01005 admin 2012-8-28 19:41
What LEED developments address specific space types and international requiremen admin 2012-8-28 0758 admin 2012-8-28 19:41
Which of the following are examples of post-consumer recycled content? admin 2012-8-28 02303 admin 2012-8-28 19:41
What should be included in a construction waste management plan for the demoliti admin 2012-8-28 02237 admin 2012-8-28 19:41
A company is building a new office building in a dense urban area 1/4 mile from admin 2012-8-28 0589 admin 2012-8-28 19:41
What strategy will reduce the rate of stormwater runoff? google 2012-8-28 0545 google 2012-8-28 19:41
Which of the following is an example of a source control waste reduction strateg admin 2012-8-28 01066 admin 2012-8-28 19:41
Selecting which of the following sites would have the greatest positive environm admin 2012-8-28 0563 admin 2012-8-28 19:41
A building owner”s project includes a major HVAC renovation, significant envelo google 2012-8-28 01546 google 2012-8-28 19:41
What does global warming potential (GWP) measure? admin 2012-8-28 0572 admin 2012-8-28 19:41
Which green building strategies help conserve natural resources? admin 2012-8-28 0989 admin 2012-8-28 19:41
What does a project team have the ability to do only after a project is register admin 2012-8-28 02182 admin 2012-8-28 19:41
Which of the following materials would be considered post-consumer recycled cont admin 2012-8-28 0608 admin 2012-8-28 19:41
What process identifies the high-performance building systems that will save mon admin 2012-8-28 0821 admin 2012-8-28 19:41
What does ASHRAE 62.1-2007 specify?

PrincessWas 2012-8-28 0590 PrincessWas 2012-8-28 19:41
What unit of measurement is used for water closets? admin 2012-8-28 0555 admin 2012-8-28 19:41
What site features are included in the landscape area?

PrincessWas 2012-8-28 0670 PrincessWas 2012-8-28 19:41
What minimum water savings are LEED v3 projects required to achieve? admin 2012-8-28 0547 admin 2012-8-28 19:41
How is ozone created? admin 2012-8-28 0504 admin 2012-8-28 19:41
What qualifies for Green Power credit for LEED projects? admin 2012-8-28 0618 admin 2012-8-28 19:41

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-18 05:29 , Processed in 0.069885 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部