LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
What is an alternative way to account for supplementary cementitious materials ( google 2012-8-12 0720 google 2012-8-12 18:42
A major renovation of a 30,000 sq. ft. dormitory on a college campus will includ google 2012-8-12 0562 google 2012-8-12 18:42
A 5 story office building is being constructed on the site of an old warehouse. google 2012-8-12 0585 google 2012-8-12 18:42
The project team is working on the project specifications for a new school. Whic google 2012-8-12 0662 google 2012-8-12 18:42
A site has 100,000 sq. ft. in hardscapes, and 25,000 sq. ft. of the hardscapes h admin 2012-8-12 0588 admin 2012-8-12 18:42
A CxA has arrived on a project site to verify the installation and performance o admin 2012-8-12 0592 admin 2012-8-12 18:42
A project team has decided to revise its design to earn exemplary performance fo admin 2012-8-12 0698 admin 2012-8-12 18:42
When building a small 15,000 sq. ft. office building, what standard is used when google 2012-8-12 0537 google 2012-8-12 18:42
An office space has 50,000 sq. ft. of floor area. 30,000 sq. ft. of the floor ar admin 2012-8-12 0975 admin 2012-8-12 18:42
For projects that will record indoor light measurements to determine daylight il admin 2012-8-12 0593 admin 2012-8-12 18:42
A building planned for a previously developed site has a zero-lot-line. Given th admin 2012-8-12 0587 admin 2012-8-12 18:42
A new construction project is including furnishings and fixtures in its Material admin 2012-8-12 0697 admin 2012-8-12 18:42
A core and shell project in Nevada has a wind energy system added to the roof. A admin 2012-8-12 0643 admin 2012-8-12 18:42
A project team has chosen to use the space-by-space method to determine the ligh PrincessWas 2012-8-12 01313 PrincessWas 2012-8-12 18:40
A rehabilitation project will be owner-occupied. How can the project achieve Sus PrincessWas 2012-8-12 0521 PrincessWas 2012-8-12 18:40
A retail store will lease out an entire building. If the baseline water use for PrincessWas 2012-8-12 0518 PrincessWas 2012-8-12 18:40
reerereeer
gggggg
ggggg
admin 2012-8-12 0544 admin 2012-8-12 17:59
dgdfgdfgdgdffgdg
fgghfghfg gjhgjgj
ghjghjfgjghjgjghfjghj
admin 2012-8-12 0547 admin 2012-8-12 17:56
An owner and project team are considering office space in an urban redevelopment admin 2012-8-12 0463 admin 2012-8-12 17:49
A project space is 45,000 sq. ft. A project team has selected a commissioning ag PrincessWas 2012-8-12 0456 PrincessWas 2012-8-12 17:49

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-1-30 06:53 , Processed in 0.086084 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部