LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A project owner wants to achieve Platinum certification. Which building design c admin 2012-8-12 0443 admin 2012-8-12 17:49
A 1-story 20,000 square foot office space has 3 rooftop HVAC units. Two units se PrincessWas 2012-8-12 0365 PrincessWas 2012-8-12 17:49
An interior designer is selecting the furniture for a modern office space. All o PrincessWas 2012-8-12 0331 PrincessWas 2012-8-12 17:44
Which factor is used in the calculation of Materials and Resources Credit, Rapid admin 2012-8-12 0290 admin 2012-8-12 17:44
A church will be built in an empty home improvement building. The following inte admin 2012-8-12 0445 admin 2012-8-12 17:44
A project has a record of a full year\\\'s electricity consumption of 500,000 kW PrincessWas 2012-8-12 0360 PrincessWas 2012-8-12 17:44
How can the additional energy needed for increasing the ventilation in a buildin PrincessWas 2012-8-12 0470 PrincessWas 2012-8-12 17:44
A building uses Tradable Renewable Certificates for green power. If the project PrincessWas 2012-8-12 0332 PrincessWas 2012-8-12 17:44
What item does not contribute to achieving Materials and Resources Credit, Const admin 2012-8-12 0407 admin 2012-8-12 17:44
A project team in the LEED charrette is discussing how to decrease energy consum PrincessWas 2012-8-12 0327 PrincessWas 2012-8-12 17:40
How can interior light trespass be reduced to achieve Sustainable Sites Credit, PrincessWas 2012-8-12 0316 PrincessWas 2012-8-12 17:40
In the section view of an office a direct line of sight can be drawn from the ty admin 2012-8-12 0328 admin 2012-8-12 17:40
A 2 story 20,000 square foot office space has 3 rooftop HVAC units. Two units s admin 2012-8-12 0349 admin 2012-8-12 17:40
The project scope for a building has changed to include graywater for non-potabl admin 2012-8-12 0294 admin 2012-8-12 17:40
A project team working on a renovation for an office wants to include interior c PrincessWas 2012-8-12 0848 PrincessWas 2012-8-12 17:40
Where does adjustable task lighting need to be installed to achieve Indoor Envir PrincessWas 2012-8-12 0318 PrincessWas 2012-8-12 17:40
A project will occupy 125,000 sq. ft. of a 250,000 sq. ft. building. How would y admin 2012-8-12 0364 admin 2012-8-12 17:40
A retail project has an overall budget of $6,450,000. The materials cost on the PrincessWas 2012-8-12 01045 PrincessWas 2012-8-12 17:40
A project expects to install 20 workstations that are made up of FSC wood, other PrincessWas 2012-8-12 0324 PrincessWas 2012-8-12 17:40
An office building has 180 full time (40 hrs/week) and 40 part time (20 hrs/week admin 2012-8-12 0686 admin 2012-8-12 17:40

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-9 22:27 , Processed in 0.084279 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部