LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
An office building has 180 full time (40 hrs/week) and 40 part time (20 hrs/week admin 2012-8-12 0945 admin 2012-8-12 17:40
A contractor is planning for an occupied flush-out to reduce IAQ problems from t PrincessWas 2012-8-12 0665 PrincessWas 2012-8-12 17:40
A small law firm is reviewing potential tenant locations for a new office. One o PrincessWas 2012-8-12 01581 PrincessWas 2012-8-12 17:40
What are the calculations for ENERGY STAR-qualified products is based on? PrincessWas 2012-8-12 0679 PrincessWas 2012-8-12 17:40
rrrrrrrrr tttttt tttttt google 2012-8-12 0743 google 2012-8-12 17:33
rrrrrrr ffff ggg google 2012-8-12 0687 google 2012-8-12 17:12
A 15,000 sq. ft. office building is trying to achieve 1 point for Energy and Atm admin 2012-8-12 01522 admin 2012-8-12 17:12
A project team is attempting Indoor Environmental Quality Credit, Construction I admin 2012-8-12 0855 admin 2012-8-12 16:22
What strategies should the project team consider for removing TSS from runoff?(c admin 2012-8-12 0787 admin 2012-8-12 16:22
A new school project will have 1,000 students from grades 4-8 and 75 FTE staff. admin 2012-8-12 0814 admin 2012-8-12 16:22
A project moved beyond the design phase before a green-building consultant was a admin 2012-8-12 0656 admin 2012-8-12 16:22
The ASHRAE Standard 55-2004 applies to which of the following?(choose 2) admin 2012-8-12 0716 admin 2012-8-12 16:22
What renewable energy systems are not eligible for Energy and Atmosphere Credit, admin 2012-8-12 0691 admin 2012-8-12 16:22
Which of the following are types of shared mult-occupant spaces?(choose 2) admin 2012-8-12 0663 admin 2012-8-12 16:22
What are structural strategies to reduce water pollution from stormwater for LEE admin 2012-8-12 0780 admin 2012-8-12 16:22
A residential building will include a common laundry room, postal area, and heat admin 2012-8-12 0760 admin 2012-8-12 16:22
If a building will have a glazed facade, what should be done for the project des admin 2012-8-12 0736 admin 2012-8-12 16:22
When calculating materials costs for some of the MR credit calculations, what is admin 2012-8-12 01290 admin 2012-8-12 16:22
A project design will include two 10,000 gallon storage tanks to capture rainwat admin 2012-8-12 0630 admin 2012-8-12 16:22
A project team is reviewing strategies for retaining stormwater on site for a pr admin 2012-8-12 0638 admin 2012-8-12 16:22

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-6-1 12:33 , Processed in 0.045565 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部