LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A lighting designer is running a computer simulation model to verify that the da PrincessWas 2012-8-10 0525 PrincessWas 2012-8-10 20:19
A project is purchasing salvaged bricks from a local company that sourced the br PrincessWas 2012-8-10 01212 PrincessWas 2012-8-10 20:19
One story of a five-story office building is being renovated for new office spac admin 2012-8-10 01266 admin 2012-8-10 20:19
When should a project team choose the performance rating method for Energy and A admin 2012-8-10 01184 admin 2012-8-10 20:19
An office building project with a retail component on the first floor totals 1,0 PrincessWas 2012-8-10 01124 PrincessWas 2012-8-10 20:19
The tenant of a building would like to purchase green power for their LEED proje admin 2012-8-10 0718 admin 2012-8-10 20:19
wfewfeffefefefe gegegege gegeg admin 2012-8-10 0587 admin 2012-8-10 19:56
The roof of an office building is approximately 30,000 sq. ft. Skylights and mec admin 2012-8-10 0653 admin 2012-8-10 19:51
In a condominium project, what requirements must be met for ETS control if the h admin 2012-8-10 0696 admin 2012-8-10 16:15
A new 24-hour veterinary clinic is being built in a neighborhood business distri admin 2012-8-10 0737 admin 2012-8-10 16:15
What is true about the timing of commissioning as it relates to a building flush admin 2012-8-10 0770 admin 2012-8-10 16:15
A new mixed-use building project in an urban area has a site area of 800,000 sq. admin 2012-8-10 03053 admin 2012-8-10 16:15
Which of the following are frequently considered types of blackwater?(choose 2) admin 2012-8-10 0534 admin 2012-8-10 09:04
What is not covered under the LEED for Core and Shell rating system?(choose 2) google 2012-8-10 02961 google 2012-8-10 09:04
Developing on a greenfield can result in:(choose 2) google 2012-8-10 02092 google 2012-8-10 09:04
Which of the following materials if reused would be considered pre-consumer recy google 2012-8-10 01442 google 2012-8-10 09:04
A project team is removing cisterns from a project design and will install a gre google 2012-8-10 0746 google 2012-8-10 09:04
What are the best design strategies for improving indoor air quality during oper google 2012-8-10 02005 google 2012-8-10 09:04
What would installing a green roof help with?(choose 2) admin 2012-8-10 0585 admin 2012-8-10 09:04
What are some of the economic benefits of green building?(choose 2) google 2012-8-10 0662 google 2012-8-10 09:04

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-1-30 04:09 , Processed in 0.073442 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部