LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
What aspects of a building do not affect IAQ? PrincessWas 2012-8-4 01470 PrincessWas 2012-8-4 18:36
A tenant space requires 26 parking spaces as defined by local code. What must th admin 2012-8-4 0627 admin 2012-8-4 18:36
A LEED AP is verifying that project spaces have views to the exterior. At what h PrincessWas 2012-8-4 0663 PrincessWas 2012-8-4 18:36
SS Credit 4.3 Alternative Transportation under LEED for New Construction gives o PrincessWas 2012-8-4 01519 PrincessWas 2012-8-4 18:36
A project will use 78,000 sf of an 112,000 sf building and have 750 FTEs. Local admin 2012-8-4 01059 admin 2012-8-4 18:36
What is not a responsibility of the CxA during fundamental commissioning? PrincessWas 2012-8-4 0677 PrincessWas 2012-8-4 18:36
An office building is located in an arid region. Installing occupancy sensors wo admin 2012-8-4 0758 admin 2012-8-4 18:36
The commissioning authority has the majority of responsibilities in enhanced com PrincessWas 2012-8-4 0952 PrincessWas 2012-8-4 18:36
A project team wants to include steel mechanical components in its calculations PrincessWas 2012-8-4 0644 PrincessWas 2012-8-4 18:36
The total area for a dentist\\\'s office is 18,522 SF. The gross lighting floor PrincessWas 2012-8-4 01509 PrincessWas 2012-8-4 18:36
A project site is 75% developed. The project team wants to improve the stormwate admin 2012-8-4 0633 admin 2012-8-4 18:36
An open office plan will have space for 50 individual workstations around the pe admin 2012-8-4 01533 admin 2012-8-4 18:36
A flooring product consists of a top layer of salvaged pine hardwoods glued to a admin 2012-8-4 01610 admin 2012-8-4 18:36
An office project will occupy an entire four story building. Each story is 25,00 admin 2012-8-4 0648 admin 2012-8-4 18:36
At the beginning of the integrated design process the project team has come toge admin 2012-8-4 01492 admin 2012-8-4 18:36
A project with a 30,000 sq. ft. building footprint has been designed with a 100% PrincessWas 2012-8-4 01537 PrincessWas 2012-8-4 18:36
Which product does not qualify towards rapidly renewable materials? PrincessWas 2012-8-4 0682 PrincessWas 2012-8-4 18:36
A building has a design case energy use of 500,000 kWh/yr. What minimum purchase admin 2012-8-4 01572 admin 2012-8-4 18:36
What is preferred parking as defined by Sustainable Sites Credit, Alternative Tr admin 2012-8-4 01520 admin 2012-8-4 18:35
Which building elements do not have to be commissioned as part of LEED certifica admin 2012-8-4 0746 admin 2012-8-4 18:35

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-6-1 16:55 , Processed in 0.056964 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部