LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
Wood products that are FSC Recycled or FSC Recycled Content can contribute to wh admin 2012-8-4 0709 admin 2012-8-4 18:31
A data center has battery banks stored inside the facility to provide temporary admin 2012-8-4 0737 admin 2012-8-4 18:31
A project takes up 68,000 SF of a 125,000 SF building. The project will have 325 PrincessWas 2012-8-4 0729 PrincessWas 2012-8-4 18:31
The total area for a dentist\\\'s office 18,522 sf. The gross lighting floor are admin 2012-8-4 0587 admin 2012-8-4 18:31
A project anticipates earning both fundamental and enhanced commissioning. Which admin 2012-8-4 0228 admin 2012-8-4 18:31
For projects that will record indoor light measurements to determine daylight il admin 2012-8-4 0705 admin 2012-8-4 18:31
A flush-out will happen where occupancy of the building will occur before flush- admin 2012-8-4 0526 admin 2012-8-4 18:31
A project for an office renovation includes site improvements to an existing con PrincessWas 2012-8-4 0433 PrincessWas 2012-8-4 18:31
Which salvaged materials - if found off-site - contribute to achieving Materials admin 2012-8-4 0872 admin 2012-8-4 18:31
Which strategies can be used to enhance a recycling program?(choose 2) admin 2012-8-4 0745 admin 2012-8-4 17:13
A project team is reviewing the building elements of an existing space that coul admin 2012-8-4 0581 admin 2012-8-4 17:13
To comply and be consistent with ASHRAE 90.1-2007, task lighting must be include PrincessWas 2012-8-4 0209 PrincessWas 2012-8-4 17:13
A project owner has selected a building site in a dense urban business district. PrincessWas 2012-8-4 0577 PrincessWas 2012-8-4 17:13
A retail project will be located in a building that has a bio-fuel based electri admin 2012-8-4 0209 admin 2012-8-4 17:13
An office project will be located in a 1-year old building that was constructed PrincessWas 2012-8-4 0211 PrincessWas 2012-8-4 17:13
A project will be naturally ventilated with operable windows. The closely tied i PrincessWas 2012-8-4 0245 PrincessWas 2012-8-4 17:13
Which credits might require use of the CBECS database?(choose 2) admin 2012-8-4 0252 admin 2012-8-4 17:13
The architect and other project designers are reviewing material choices for of PrincessWas 2012-8-4 0201 PrincessWas 2012-8-4 17:13
A value engineering exercise has resulted in a building owner\\\'s choosing to r PrincessWas 2012-8-4 0270 PrincessWas 2012-8-4 17:13
A project space was selected in a LEED certified building. The building owner de admin 2012-8-4 0682 admin 2012-8-4 17:13

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-1 02:10 , Processed in 0.088268 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部