LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
A CxA has arrived on a project site to verify the installation and performance o PrincessWas 2012-8-4 0594 PrincessWas 2012-8-4 17:13
A CxA has been selected to perform the fundamental commissioning of a new comput PrincessWas 2012-8-4 0429 PrincessWas 2012-8-4 17:13
The total area of a building project is 50,300 sf. A new tenant space will be 39 PrincessWas 2012-8-4 01189 PrincessWas 2012-8-4 17:13
A residential building project will permit smoking in residences on certain floo PrincessWas 2012-8-4 01122 PrincessWas 2012-8-4 17:13
An project will reuse an existing space. The area of retained components is larg PrincessWas 2012-8-4 01132 PrincessWas 2012-8-4 17:13
A tenant has selected a building with a site development density of 70,000 SF in PrincessWas 2012-8-4 0484 PrincessWas 2012-8-4 17:13
A two-story office space has natural ventilation. What will the design need to i admin 2012-8-4 0885 admin 2012-8-4 17:13
A project will have space control devices in each area enclosed by ceiling-heigh admin 2012-8-4 0451 admin 2012-8-4 17:13
The project team for a retail shopping space is calculating the baseline indoor PrincessWas 2012-8-4 01223 PrincessWas 2012-8-4 17:13
The building location for an office project has no irrigation for landscaping. H admin 2012-8-4 0796 admin 2012-8-4 17:13
During the design phase, a LEED project for a retail development has earned one admin 2012-8-4 01296 admin 2012-8-4 17:13
The project owner has designated you to hire the Enhanced Commissioning Authorit admin 2012-8-4 0752 admin 2012-8-4 15:38
For a multi-unit residential building that permits smoking, what should be done PrincessWas 2012-8-4 01286 PrincessWas 2012-8-4 12:24
A business owner is reviewing potential locations for the company\\\'s new offic admin 2012-8-4 01154 admin 2012-8-4 12:21
What will minimize the extent to which increased ventilation requires additional google 2012-8-4 0569 google 2012-8-4 12:15
A building on a college campus has 80 full-time staff and 40 part-time staff (4 PrincessWas 2012-8-3 0772 PrincessWas 2012-8-3 09:23
A CxA is planning on meeting with the O&M staff and occupants to review the oper PrincessWas 2012-8-3 0964 PrincessWas 2012-8-3 09:23
An emergency veterinary office located in a strip mall will be open 24 hours a d PrincessWas 2012-8-3 0937 PrincessWas 2012-8-3 09:23
How can the project team calculate the materials costs for MR credits? admin 2012-8-3 01014 admin 2012-8-3 09:23
Which products are NOT included in Composite Wood and Agrifiber Products? admin 2012-8-3 0875 admin 2012-8-3 09:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-10-21 22:18 , Processed in 0.085042 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部