LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
In a mechanically ventilated office project many of the office workers will have PrincessWas 2012-8-3 0742 PrincessWas 2012-8-3 09:23
An office space on the bottom floor of a building has no skylights. A project wi admin 2012-8-3 0590 admin 2012-8-3 09:23
A tenant space is chosen that has an underground stormwater treatment system tha PrincessWas 2012-8-3 0784 PrincessWas 2012-8-3 09:23
What project strategy would earn the most points for optimizing energy performan admin 2012-8-3 0300 admin 2012-8-3 09:23
A contractor will conduct a phased flush out of a building. The office building PrincessWas 2012-8-3 0294 PrincessWas 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 0244 admin 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 0698 admin 2012-8-3 09:23
A project will reuse refurbished steel door hardware obtained off-site from a sa admin 2012-8-3 0303 admin 2012-8-3 09:23
A contractor is documenting an IAQ plan that will be provided to each sub-contra PrincessWas 2012-8-3 0779 PrincessWas 2012-8-3 09:23
A project building is 68,490 sf. A tenant has leased out 50,200 sf. The project PrincessWas 2012-8-3 0739 PrincessWas 2012-8-3 09:23
A tenant has chosen office space in a LEED-certified New Construction building t admin 2012-8-3 0667 admin 2012-8-3 09:23
An office park in a suburban area needs to earn Sustainable Sites Credit, Heat I admin 2012-8-3 0813 admin 2012-8-3 09:23
What certification program tests and certifies hard surface flooring and associa PrincessWas 2012-8-3 0494 PrincessWas 2012-8-3 09:23
A project site has been chosen where the prior project team of the building had PrincessWas 2012-8-3 0326 PrincessWas 2012-8-3 09:23
For a project that uses an overhead variable air volume system, enough control p PrincessWas 2012-8-3 0259 PrincessWas 2012-8-3 09:23
When using the VOC budget methodology, by what amount must the design case be le PrincessWas 2012-8-3 0326 PrincessWas 2012-8-3 09:23
A building is being renovated and the owner will occupy the fourth floor of a 4- PrincessWas 2012-8-3 0491 PrincessWas 2012-8-3 09:23
The design team is documenting the basis of design for fundamental commissioning admin 2012-8-3 0713 admin 2012-8-3 09:23
Which factor is used to determine the percentage of materials reused on a projec admin 2012-8-3 0387 admin 2012-8-3 09:23
A project team is attempting to divert construction waste from the landfill. Tot PrincessWas 2012-8-3 0474 PrincessWas 2012-8-3 09:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-30 21:35 , Processed in 0.084326 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部