LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
An emergency veterinary office located in a strip mall will be open 24 hours a d PrincessWas 2012-8-3 01406 PrincessWas 2012-8-3 09:23
How can the project team calculate the materials costs for MR credits? admin 2012-8-3 01581 admin 2012-8-3 09:23
Which products are NOT included in Composite Wood and Agrifiber Products? admin 2012-8-3 01159 admin 2012-8-3 09:23
In a mechanically ventilated office project many of the office workers will have PrincessWas 2012-8-3 01609 PrincessWas 2012-8-3 09:23
An office space on the bottom floor of a building has no skylights. A project wi admin 2012-8-3 01532 admin 2012-8-3 09:23
A tenant space is chosen that has an underground stormwater treatment system tha PrincessWas 2012-8-3 01679 PrincessWas 2012-8-3 09:23
What project strategy would earn the most points for optimizing energy performan admin 2012-8-3 0771 admin 2012-8-3 09:23
A contractor will conduct a phased flush out of a building. The office building PrincessWas 2012-8-3 0754 PrincessWas 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 0720 admin 2012-8-3 09:23
A project\\\'s interior nonstructural components will be reused for their origin admin 2012-8-3 01656 admin 2012-8-3 09:23
A project will reuse refurbished steel door hardware obtained off-site from a sa admin 2012-8-3 0732 admin 2012-8-3 09:23
A contractor is documenting an IAQ plan that will be provided to each sub-contra PrincessWas 2012-8-3 01642 PrincessWas 2012-8-3 09:23
A project building is 68,490 sf. A tenant has leased out 50,200 sf. The project PrincessWas 2012-8-3 01608 PrincessWas 2012-8-3 09:23
A tenant has chosen office space in a LEED-certified New Construction building t admin 2012-8-3 01584 admin 2012-8-3 09:23
An office park in a suburban area needs to earn Sustainable Sites Credit, Heat I admin 2012-8-3 01758 admin 2012-8-3 09:23
What certification program tests and certifies hard surface flooring and associa PrincessWas 2012-8-3 0899 PrincessWas 2012-8-3 09:23
A project site has been chosen where the prior project team of the building had PrincessWas 2012-8-3 0786 PrincessWas 2012-8-3 09:23
For a project that uses an overhead variable air volume system, enough control p PrincessWas 2012-8-3 0689 PrincessWas 2012-8-3 09:23
When using the VOC budget methodology, by what amount must the design case be le PrincessWas 2012-8-3 0786 PrincessWas 2012-8-3 09:23
A building is being renovated and the owner will occupy the fourth floor of a 4- PrincessWas 2012-8-3 0897 PrincessWas 2012-8-3 09:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-10-1 04:33 , Processed in 0.051396 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部