LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
Which project criteria would not be eligible for Materials and Resources Credit, PrincessWas 2012-7-29 01604 PrincessWas 2012-7-29 22:19
An old office building is being renovated. What should be the design strategy to PrincessWas 2012-7-29 01430 PrincessWas 2012-7-29 22:19
A project design includes an active wastewater treatment system to treat 75% of PrincessWas 2012-7-29 01731 PrincessWas 2012-7-29 22:19
What is an important difference between the energy cost budget and the performan admin 2012-7-29 01715 admin 2012-7-29 22:19
A desktop computer has a rated power of 120 watts. The computer will be upgraded admin 2012-7-29 01096 admin 2012-7-29 22:19
An office building has a total of 646 tenant occupants at peak periods. A new te PrincessWas 2012-7-29 0788 PrincessWas 2012-7-29 22:19
A project is located 1/2 mile from a commuter light rail stop and wants to earn PrincessWas 2012-7-29 01569 PrincessWas 2012-7-29 22:19
A tenant has selected a LEED building for some new office space. The building wa PrincessWas 2012-7-29 0713 PrincessWas 2012-7-29 22:19
The total CSI MasterFormat Division 12 Material Value on a project is $1,000,000 PrincessWas 2012-7-29 01553 PrincessWas 2012-7-29 22:19
The project owner has designated you to hire the Enhanced Commissioning Authorit admin 2012-7-29 0912 admin 2012-7-29 15:31
A 254,000 sq. ft. building is attempting to earn an exemplary performance point. admin 2012-7-29 01764 admin 2012-7-29 15:31
The space-by-space method would be used to measure what aspect of a project? admin 2012-7-29 01094 admin 2012-7-29 15:31
A 24-hour fitness center is being built out on the second floor of a downtown bu admin 2012-7-29 01571 admin 2012-7-29 15:05
A project will attempt to achieve enhanced commissioning for the project. Which admin 2012-7-29 01670 admin 2012-7-29 15:05
An office project will have high-efficiency toilets that are pressure assisted ( admin 2012-7-29 01586 admin 2012-7-29 15:05
A tenant is allotted 500 parking spaces by the building owner. There are 1000 av admin 2012-7-29 0959 admin 2012-7-29 15:05
A project area is 20,000 sf. The total segment area for the project is 100,000 s admin 2012-7-29 0874 admin 2012-7-29 15:01
A project has daylighting in 81% of required spaces. How many points can this pr admin 2012-7-29 0885 admin 2012-7-29 15:01
A project will renovate and occupy all 5 stories of an office building. Local co admin 2012-7-29 0828 admin 2012-7-29 14:46
What type of energy system cannot earn Sustainable Sites Credit, Site Selection, admin 2012-7-29 0732 admin 2012-7-29 14:39

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-6-1 14:07 , Processed in 0.055396 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部