LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
8. ___ When should shade studies be conducted? admin 2022-9-13 0295 admin 2022-9-13 16:58
7. ___ C4.7 Conserve & restore native plant communities - vegetated area require admin 2022-9-13 0914 admin 2022-9-13 16:55
6. ___ Cultural Landscape admin 2022-9-13 0292 admin 2022-9-13 16:52
81. includes moderate-intensity
activities in a usual week (e.g., brisk walk
admin 2022-9-13 0327 admin 2022-9-13 16:46
80. the design of buildings
or products to facilitate future change and the
admin 2022-9-13 0323 admin 2022-9-13 16:41
79. the placement of physical
features, activities, people, and amenities th
admin 2022-9-13 0901 admin 2022-9-13 16:41
78. include groundwater, creeks,
streams, rivers, lakes, or other water bodi
admin 2022-9-13 0830 admin 2022-9-13 16:40
77. includes the owner, client, and professionals knowledgeable in design, cons admin 2022-9-13 0319 admin 2022-9-13 16:40
76.Option 1:
-total site users and times of peak site use
-lis
admin 2022-9-13 0319 admin 2022-9-13 16:38
75. process of scheduled preventative maint. based on monitoring and use of cult admin 2022-9-13 0304 admin 2022-9-13 16:37
74. Plant health care plan (4 pts)
-ban weed and feed
-set and
admin 2022-9-13 0417 admin 2022-9-13 16:37
73. Recycle organic matter
-conduct waste stream study of vegetation tr
admin 2022-9-13 0364 admin 2022-9-13 16:36
72. -relationship between climate and physiological events such as bud break, bl admin 2022-9-13 0329 admin 2022-9-13 16:34
71. largest unit of vegetation type in biosphere with similar plant architecture admin 2022-9-13 0820 admin 2022-9-13 16:31
70. P3.1 Manage Precip on Site (meet BMP database req)
C3.3 Manage prec
admin 2022-9-13 0402 admin 2022-9-13 16:24
69. Option 1 - Educational and Interpretive Elements (3pts)
-provide 3+
admin 2022-9-13 01006 admin 2022-9-13 16:24
68. Protect floodplain functions → P1 admin 2022-9-13 0758 admin 2022-9-13 16:24
67. Design functional stormwater features as amenities (50% of features 4 pts; 1 admin 2022-9-13 0675 admin 2022-9-13 16:24
66. Conserve special status vegetation → C4 admin 2022-9-13 0287 admin 2022-9-13 16:23
65. Divert construction and demolition materials from disposal → C7 admin 2022-9-13 0329 admin 2022-9-13 16:18

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-8 23:55 , Processed in 0.071495 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部