LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
24. -Provide a windbreak
>>trees/shrubs along winter wind facade (1pt)
admin 2022-9-13 0433 admin 2022-9-13 15:30
23. Any area not covered by a VSPZ, not covered by pavement, and will be re-vege admin 2022-9-13 0445 admin 2022-9-13 15:29
22. Minimize effects on microclimate and human and wildlife habitat by using veg admin 2022-9-13 0437 admin 2022-9-13 15:29
21. -Provide shade structures - shade 100% of HVAC units
-Shade W/SW/SE/E bu
admin 2022-9-13 0435 admin 2022-9-13 15:28
20. Maintain existing ecosystem services and landscape performance, reduce resou admin 2022-9-13 0431 admin 2022-9-13 15:28
19. Eliminate long-term irrigation, use recycled water for establishment period admin 2022-9-13 0760 admin 2022-9-13 15:25
18. Conserve water resources and minimize energy use by reducing the use of pota admin 2022-9-13 0431 admin 2022-9-13 15:24
17. Based on 9 Attributes of Restored Ecosystems, complete site maintenance plan admin 2022-9-13 0378 admin 2022-9-13 15:18
16. effluent derived from sewage from a wastewater treatment system that has bee admin 2022-9-13 0371 admin 2022-9-13 15:17
15. Maintain site water balance, protect water quality, and reduce negative impa admin 2022-9-13 0436 admin 2022-9-13 15:07
14. communication method(s)
incorporate all viewpoints for full consi
admin 2022-9-13 01000 admin 2022-9-13 14:55
13. Includes:
-unique site characteristics, opps and constraints
-genera
admin 2022-9-13 0373 admin 2022-9-13 14:54
12. Diameter at Breast Height is standard method for determining the trunk diame admin 2022-9-13 0413 admin 2022-9-13 14:54
11. development (trail, picnic area, boardwalk) that does not significantly alte admin 2022-9-13 01075 admin 2022-9-13 14:54
10. Narrative or written design that provides mechanism for clearly stating the admin 2022-9-13 0417 admin 2022-9-13 14:48
9. Soils and vegetation within VSPZs must not be disturbed or compacted during c admin 2022-9-13 01029 admin 2022-9-13 14:46
8. Soils native to a site described in Natural Resources Conservation Service So admin 2022-9-13 0387 admin 2022-9-13 14:42
7. Brownfield Sites
-site plan with contaminated areas and levels/types of c
admin 2022-9-13 01004 admin 2022-9-13 14:42
6. Sites without floodplain
-Requires map showing site boundary and that it
admin 2022-9-13 01010 admin 2022-9-13 14:42
5. Sites with naturally occurring aquatic ecosystems
-delineate full geograp
admin 2022-9-13 01021 admin 2022-9-13 14:40

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-10-28 07:52 , Processed in 0.062748 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部