LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
which of the following meets the requirements of the iaqp during construction? admin 2020-8-27 01171 admin 2020-8-27 19:27
Which of the following is not included in the calculation of wastes that can be admin 2020-8-27 0590 admin 2020-8-27 19:27
A large number of native plants are used in a project, which two LEED scores are admin 2020-8-27 0650 admin 2020-8-27 19:27
If an office building project wants to obtain LT score, surrounding density and admin 2020-8-27 01453 admin 2020-8-27 19:27
Which of the following projects may obtain LEED architectural design and constru admin 2020-8-27 01333 admin 2020-8-27 19:27
Which of the following can contribute to the LEED score green power and carbon c admin 2020-8-27 01095 admin 2020-8-27 19:27
Which of the following materials cannot be included in construction and material admin 2020-8-27 01538 admin 2020-8-27 19:27
based on the publicity and optimization of construction products and analysis - admin 2020-8-27 0654 admin 2020-8-27 19:27
Which of the following measures can reduce outdoor water use admin 2020-8-27 0665 admin 2020-8-27 19:27
which of the following products can be included in the analysis, publicity and o admin 2020-8-27 01575 admin 2020-8-27 19:27
In order to reduce the energy load of buildings and achieve the relevant sustain admin 2020-8-27 0652 admin 2020-8-27 19:27
Which of the following points is related to the shower? admin 2020-8-27 0624 admin 2020-8-27 19:27
According to the analysis, publicity and optimization of construction products - admin 2020-8-27 01429 admin 2020-8-27 19:27
A project has one main entrance and two freight entrances. Where must a no smoki admin 2020-8-27 01261 admin 2020-8-27 19:27
The public transport system near a project is under construction, and a large pr admin 2020-8-27 01482 admin 2020-8-27 19:27
in which case can the project obtain a good performance score for stormwater man admin 2020-8-27 0657 admin 2020-8-27 19:27
in the construction process of a project, it was found that the construction cos admin 2020-8-27 01413 admin 2020-8-27 19:27
A project is located in a previously developed area.The site area is 10000 squa admin 2020-8-27 0663 admin 2020-8-27 19:27
In order to reduce the amount of construction and demolition waste to be dispose admin 2020-8-27 0731 admin 2020-8-27 19:27
The following is about EQ score points: enhance indoor air quality strategy, the admin 2020-8-27 0583 admin 2020-8-27 19:27

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-10-2 07:33 , Processed in 0.046827 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部