LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7702

作者 回复/查看 最后发表
according to the analysis, publicity and optimization of construction products - admin 2020-8-27 0604 admin 2020-8-27 19:27
for the initial energy consumption simulation of the project, which stage is rec admin 2020-8-27 0902 admin 2020-8-27 19:27
LEED certification encourages the project to hold a workshop at the beginning of admin 2020-8-27 01096 admin 2020-8-27 14:04
a school, it is suggested to open a window in the classroom, how to report to t admin 2020-8-27 0799 admin 2020-8-27 09:37
How to install water meters to measure water consumption when multiple buildings admin 2020-8-27 0731 admin 2020-8-27 09:37
For energy consumption simulation, which parameters of the benchmark building an admin 2020-8-27 0760 admin 2020-8-27 09:37
a project statistical score found that only one point from platinum.There is a admin 2020-8-27 0914 admin 2020-8-27 09:36
hich of the following situations can apply for innovation score? admin 2020-8-27 0572 admin 2020-8-27 09:36
when calculating light pollution, which of the following should be included in t admin 2020-8-27 0592 admin 2020-8-27 09:36
the designer should adopt a number of measures to manage rainwater, reduce storm admin 2020-8-27 0587 admin 2020-8-27 09:36
which of the following measures can directly reduce greenhouse gas emissions? admin 2020-8-27 0666 admin 2020-8-27 09:36
which of the following is an acceptable CSR framework admin 2020-8-27 0639 admin 2020-8-27 09:36
What strategy can be adopted to improve the comfort of a temperate residential p admin 2020-8-27 0583 admin 2020-8-27 09:36
how is the distance of local materials calculated? admin 2020-8-27 0772 admin 2020-8-27 09:36
a project encourages households to recycle a variety of materials. This recycli admin 2020-8-27 0826 admin 2020-8-27 09:36
which of the following low environmental impact development measures can reduce admin 2020-8-27 0604 admin 2020-8-27 09:36
which of the following lid measures can help reduce runoff pollution? (choose tw admin 2020-8-27 0582 admin 2020-8-27 09:36
which can contribute to the open space? admin 2020-8-27 0581 admin 2020-8-27 09:36
In a retail project, the business hours are from 10:00 a.m. to 6:00 p.m. the pro admin 2020-8-27 0563 admin 2020-8-27 09:36
A project is applying for LEED certification, with a building area of 1000 squar admin 2020-8-27 0607 admin 2020-8-27 09:36

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-10-2 07:32 , Processed in 0.061965 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部