A project team is planning to use green power obtained from a separate campus facility through an internal campus agreement. The project team did not use an energy model for Energy and Atmosphere Credit, Optimize Energy Performance. No other buildings on campus obtain power from this facility. What is true about the project’s ability to earn Energy and Atmosphere Credit, Green Power?
A: The project will be required to purchase RECs
B: The campus facility that supplies the power does not have to be Green-e Certified
C: At least 70% of the power supplied must be certified, along with a 2-year contract
D: The project building can share the credit with other buildings on campus

参考答案: B

本题解释:
Notes:
A campus facility can obtain green power from a centralized or other campus facility, as long as the power isn’t shared with another project
(double dipping).
The facility does not have to be Green-e certified, just the power.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-7 22:50 , Processed in 0.099805 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部