- 注册时间
- 2012-6-6
- 最后登录
- 2025-4-28
- 阅读权限
- 200
- 积分
- 5684
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED AP BD+C模拟题B[查看] A new mixed-use construction project will include an onsite wastewater treatment system.
The project will include both offices and residential condominiums. The wastewater will be
used in landscaping features around the property. The project team is discussing ways to
reduce potable water use for sewage conveyance. What strategy will not help with
reducing potable water use for sewage conveyance? A: Installing HETs in all public restrooms B: Using municipally treated wastewater for flushing all urinals C: Installing low-flow sinks in the residential bathrooms D: Using rainwater for flushing all water closets 参考答案: C
本题解释: Notes:
Reference: Water Efficiency, Innovative Wastewater Technologies, Requirements
The water use reductions for this credit are achieved through the use of water conserving flush
fixtures (water closets, urinals), not flow fixtures (sinks, showers).
Non-potable water is also used to achieve this credit. |
|