The project owner has designated you to hire the Enhanced Commissioning Authorit

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:45:07 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题C[查看]
The project owner has designated you to hire the Enhanced Commissioning Authority for a 100,000 sq. ft. retail center. What restrictions must you ensure the Commissioning Authority meets to qualify for LEED credit?(choose 2)
A: Have building experience on at least 3 other building projects
B: Not an employee or contractor of the owner
C: Be independent of the design and construction work
D: Not a contracted employee through the design firm
E: Not an employee of a contractor or construction manager that holds construction contracts

参考答案: CE

本题解释:
Notes:
See EA Credit 3 Enhanced Commissioning, Requirements
The CxA must:
- be independent of the design and construction work
- not be an employee of the design firm
- not be an employee of or contracted by a contractor holding construction contracts
The CxA can be an employee or consultant to the owner
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-6 18:33 , Processed in 0.107587 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部