A 10,000 SF parking area will be replaced with 50% pervious pavement with an SRI

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-6 19:04:25 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
A 10,000 SF parking area will be replaced with 50% pervious pavement with an SRI of 42. This parking area will be shaded with new trees within 3 years. Additionally, there will be 10,000 SF of solar panel shaded walkways and 15,000 SF of sidewalks with an imperviousness of 80%. How much surface area can contribute to Sustainable Sites Credit, Heat Island Effect-Nonroof?
A: 0 SF
B: 20,000 SF
C: 35,000 SF
D: 10,000 SF

参考答案: B

本题解释:
Notes:
See Sustainable Sites Credit, Heat Island Effect-Nonroof, Calculations, Option A
For this option spaces that meet the requirements cannot be counted twice.
The 10,000 SF parking area will be counted once as will the 10,000 shaded walkways. The 15,000 sidewalks that are 80% impervious do not meet the requirements.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-7 03:31 , Processed in 0.100294 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部