A project team discovers a new way to avoid the heat island effect. How does the LEED certification process reward this new concept?
A: An extra Heat Island Effect point would be awarded
B: An innovative performance point would be awarded
C: An exemplary performance point would be awarded
D: Heat Island Effect is covered by LEED, so no additional points would be given

参考答案: D

本题解释:
Innovative performance as part of the Innovation in Design or Operations category is meant for green building categories not specifically addressed by LEED. Innovation credits are not awarded for the use of a particular product or design strategy if the technology aids in the achievement of an existing LEED credit.

USGBC/GBCI uses the CIR process for cases like this. A CIR could be submitted that specifies an alternate way to earn the Heat Island credit. However only the Heat Island credit would be earned, not an ID point or extra points.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-7 07:30 , Processed in 0.081812 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部