What is the minimum occupancy rate required for LEED for Existing Buildings: Ope

[复制链接]

1759

主题

1

好友

5690

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-15 16:56:55 |只看该作者 |倒序浏览
试卷: LEED GA模拟题E[查看]
What is the minimum occupancy rate required for LEED for Existing Buildings: Operations & Maintenance to earn certification?
A: 80% of FTEs
B: 75% of FTEs
C: 1 FTE
D: Typical physical occupancy

参考答案: D

本题解释:
Notes:

Reference: GBCI LEED Certification Policy Manual
For O&M the building must be in a state of typical physical occupancy.

For example, a hotel usually has a typical occupancy of about 60% of the rooms rented out. The O&M certification could not be attempted until the hotel was at least 60% occupied. If the hotel was just constructed and didn’ have any occupants the certification could not be earned.

A school dormitory is another example. If the dormitory was completed in April but will not be occupied until the fall semester in September, the project is not yet in typical occupancy because no students are living in the dorm between April - August.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏2
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-5 06:01 , Processed in 0.078391 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部