- 注册时间
- 2012-6-6
- 最后登录
- 2025-7-3
- 阅读权限
- 200
- 积分
- 5690
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED GA模拟题D[查看] When purchasing RECs what is the project purchasing?
A: Carbon offsets B: Electricity C: Positive environmental attributes of off-site renewable energy D: On-site renewable energy 参考答案: C
本题解释: Notes:
Reference: Guide to Purchasing Green Power
RECs are not the equivalent of carbon offsets.
Purchasing RECs isn\'t a way to bypass purchasing power; when RECs are purchased, the project still needs to pay the normal electricity bills.
RECs are a tradable commodity representing the \'greenness\' of green power. They are purchased when a project does not have access to green power through their utility provider.
RECs represent the reduced emissions of renewable energy compared to conventional fossil fuels. RECs are sold separately allowing people to purchase the \'greenness\' of the electricity. This allows anyone to purchase an REC even if the power to their building is not green power.
RECs have no geographic constraints, because they are sold separately from electricity. A project in Maine can purchase RECs from any other state.
RECs cannot be purchased for a projects own on-site renewable energy systems. For example if a project has a solar array the building owner could not issue RECs to themselves. |
|