- 注册时间
- 2012-6-6
- 最后登录
- 2025-7-3
- 阅读权限
- 200
- 积分
- 5690
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED GA模拟题E[查看] A CIR submission should be made: A: After project registration B: CIR submissions are available only after a project has been registered. B When filling out the LEED checklist C: To determine a project”s baseline water use D: To change the rating system a project is certifying under 参考答案: A
本题解释: A:CIR submissions are available only after a project has been registered.
B:When the project team fills out the LEED checklist they are determining what credits the project is likely to achieve. CIR submissions would be done after the credits that will be or may be attempted have been selected.
C:CIRs are not used to determine baseline measurements for water use.
D:A project team can decide to change the rating system the project will be certified under, but the CIR process would not be used for that. |
|