LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 302|回复: 0
打印 上一主题 下一主题

The design team for a 15-story office building is looking for ways to increase d

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-29 13:32:50 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题E[查看]
The design team for a 15-story office building is looking for ways to increase daylighting without increasing the number of windows. Which of the following strategies would most effectively accomplish this goal? (choose 2)
A: Adding light shelves
B: Move a higher percentage of the windows above the 10th story
C: Locate a higher percentage of the windows below 7’-6’’
D: Add better glare control for interior spaces
E: Optimize the building’s orientation

参考答案: AE

本题解释:
Notes:
See the ‘Implementation’ section of SSc 8

Windows located ABOVE 7’-6’’ are considered to be daylight glazing and would most likely improve daylighting

Selecting windows with a lower visible transmittance (Tvis) factor would decrease the amount of incident light passing through.

Although glare control is an important design consideration, it does not affect daylighting calculations.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-6 09:54 , Processed in 0.073412 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部