试卷: LEED AP BD+C模拟题E[查看] A project team is looking to earn as many LEED points as possible by taking advantage of credit synergies. The project will be constructed on a greenfield site. Creating an erosion control plan for Sustainable Sites prerequisite, Construction Activity Pollution creates potential synergies with which of the following credits? (Choose 3) A: Site Selection B: Site Development: Protect or Restore Habitat C: Site Development: Maximize Open Space D: Stormwater Design: Quantity Control E: Water Efficient Landscaping 参考答案: BCD
本题解释: Notes:
SSp1: Construction Activity Pollution involves creating an Erosion and Sedimentation Control (ESC) Plan. Implementing an ESC Plan directly affects both SSc 6.1 & 6.2, which are related to the quantity and quality of stormwater runoff.
Limiting site disturbance on a greenfield site can contribute to SSc 5.1 as well as the Erosion and Sedimentation Control (ESC) Plan for SSp 1. Limiting site disturbance is an effective way to prevent erosion.
See the ‘Related Credits’ section of the LEED Reference Guide for Green Building Design and Construction |
|